MP2800 Series Router Install Manual V1.2
Maipu Confidential & Proprietary Information
Page 33 of 47
Therefore, pay attention to the following:
§
Take anti-electric network interference for power system.
§
§
The router working place had better not be used with the grounding
settings of power devices or anti-thunder grounding settings and the
distance between them had better be as long as possible.
§
§
Be away from the strong power radio transmitters, radar transmitter,
and high frequency high-current equipments.
§
§
Take electromagnetic shielding methods when necessary.
Anti-lightning
MP2800 router takes lots of measures in anti-lightning, but when the
lightning exceeds a certain volume, the router may be damaged. To
prevent the damages caused by lightning, do as follows:
§
Ensure that the protect ground of the chassis is well grounded;
§
§
Ensure that the grounding point of AC power supply jack is well
grounded;
§
Add power lightning arrester to the input end of the power supply, so
as to improve the anti-lightning capability of the power supply;
§
§
To improve the anti lightning capability, the MP2800 interface modules
are connected to outdoor signal lines. You can add special anti-
lightning equipment to the input end of signal lines.
Check Routers & Accessories
After ensuring the installation environment requirements are met, you can
open the package. However, before installation, check whether the router
and the accessories are complete according to the purchase order.
Tools & Equipment
Tools
§
Slotted point screwdriver/cross point screwdriver
§
§
Level, ruler or tapeline
文件使用
"pdfFactory Pro"
试用版本创建
(
www.fineprint.com.cn