© MAHLE
Commissioning | ACX1281 | 15
ACX1281 | 15
| 15
en
4. Commissioning
t
All the operations described in Section 4 must be performed
prior to first A/C service.
4.1
Removing transportation packaging
m
When removing the packaging, use care to ensure there is no
damage caused to the ACX1281 unit or any of the included
accessories.
t
Do not unplug any electrical connections and only have in-
ternal components opened and repaired by trained customer
service personnel.
t
Contact customer service in the event of any transportation
damage (e.g. oil leakage).
4.2
Attaching handles
1.
Remove plastic bubble wrap from handle.
2.
Locate hex (Allen) key included in document packet of unit.
3.
Using included hex (Allen) key, remove bolt from rear handle
mounting hole (both sides of ACX1281 unit).
4.
Rotate handle upwards and over top of the handle mounting
spacers.
Fig. 11: Setting up handle
5.
Insert the bolt on each side through handle and the spacer
and tighten.
Fig. 12: Insert bolt and tighten
6.
Tighten the bolt at the front side of the handle to ensure it
does not come loose at a later time.
Summary of Contents for ACX1281
Page 1: ...MAHLE ACX1281 EN Operation manual A C Service Units...
Page 33: ...MAHLE Notes 33 en 12 Notes...
Page 34: ...MAHLE 34 ACX1281 Notes en...
Page 35: ...MAHLE Notes 35 en...