16 Series, Model - 2816 HST
43
If run-in instructions for a new engine are not followed, you can cause
damage to piston rings and cylinder walls.
LOAD
Never operate an engine immediately under full load. Allow the engine to
warm up before operating it at full load. Run-in the engine carefully as
shown in the table.
Full load governed
speed with occasional
short periods of lighter
load.
NO LOAD
Do not run the engine at idle speed. When not operating the engine with
a load, you can keep the correct engine operating temperature if you run
the engine at approximately 1500 RPM.
REAR WHEEL BOLTS
After the first 10 hours of operation, check the rear wheel bolts. Tighten
all wheel bolts to the torque give in the Wheel Mounting Torques in this
manual.
FRONT WHEEL BOLTS
After the first 10 hours of operation, check the front wheel bolts. Tighten
the bolts to the torques shown in the Wheel Mounting Torques in this
manual.
FRONT FRAME BOLTS
After the first 10 hours of operation, check the front frame bolts. Tighten
the bolts to the torque shown below.
Front Frame Mounting Torques
Side (M12x35), 8 Bolts (4LH and 4RH)... 83 to 93 Nm (61 to 69 lb ft)
LOWER LINK BRACKET BOLTS
After the first 10 hours of operation, check the Lower Link Bracket bolts.
Tighten the bolts to the correct tightening torque 39 to 44 Nm (29 to 33
Ib ft).
Fully
advanced
1st Hour
2nd
Through
5th Hour
Fully
advanced
Period
Engine Speed
Control Lever
Position
Load
Maintain engine speed
100 RPM above full load
governed speed.
OPERATING INSTRUCTIONS _______________________________________________
RUN-IN
PROCEDURE