(6)
REAR PTO counter shaft mechanism
Fig.5-50
1.Gear,spur 12 2.Gear spur 14 3. Snap ring(shaft) 4. Ball bearing(6205) 5. Ball bearing(6305)
Note:
- When pushing the R.B.B’s(6305,6205) into the gear ,spur 12,be careful only to push
their inner races.
- The snap ring C should be securely seated in the groove and the press-processed side
turned towards the outer side.
- Be sure not to mix different pairs of the gear(spur/14).
- Every time a gear is installed,its smooth rotation should be checked.
a. REAR PTO shaft
1.Shaft PTO
2.Snap ring
Note:
The snap ring C should be securely seated in the groove and the press-processed side
turned towards the outer side.
Fig.5-51
b.REAR PTO shift stay
1.Stay PTO shift
2.O- ring
Fig.5-52
Note:
- When installing the O-ring to rear transmission case,take care not to damage it or
allow to fall.
5-38
Summary of Contents for 2810
Page 17: ...3 Engine model and engine serial number plate on the head cover 1 16...
Page 21: ...SECTION 3 GEAR TRAIN DIAGRAMS FIG 1 3 GEAR TRAIN DIAGRAM 1 20...
Page 24: ...2 CONTROLS 1 23...
Page 33: ...SECTION 2 OPERATION CHART FOR DISASSEMBLY AND REASSEMBLY BY MAJOR BLOCKS 2 4...
Page 84: ...Fig 5 25 Main change gear and related parts 5 16...
Page 91: ...b Pay attention to the installed direction of gear Fig 5 36 5 23...
Page 92: ...4 Rear transmission case Fig 5 38 5 24...
Page 112: ...5 44 Fig 5 57 Power Train diagram...
Page 173: ...3 LINKAGE EXTERNAL Fig 9 37 Linkage external 9 19...
Page 196: ...A B Fig 10 27 Hood frame 10 12...
Page 197: ...SECTION 6 WIRING DIAGRAM 10 13...