26
BA364601-en
4.3
Preparations
4.3.1
Initial Position/Ready for Operation
•
The main switch must be at position 0.
•
The lift must be fully lowered.
•
The support arms must be pivoted completely away from the working area
(initial position, see diagram.)
4.3.2
Positioning of the Vehicle
•
Carefully drive the vehicle forwards, centrally between the lift columns, and
then apply the parking brake.
•
The centre of gravity of the vehicle should be as central as possible between
the lift columns.
•
Tip: If it is necessary to open the doors completely, the vehicle can also be
positioned backwards between the lift columns.
IMPORTANT:
Again, ensure that the vehicle’s centre of gravity is as central
between the two lift columns as possible!
Summary of Contents for MA STAR 5.5
Page 1: ...MA STAR 5 5 Two Post Lift Original Operating Instructions BA364601 en...
Page 11: ...BA364601 en 11 2 3 2 Installation Diagram MA STAR 5 5 Standard...
Page 14: ...14 BA364601 en 2 3 5 Installation Diagram MA STAR 5 5 Slim...
Page 17: ...BA364601 en 17 2 3 8 Installation Diagram MA STAR 5 5 Wide...