Physical Installation
●
Assembly and Mounting
14
CONTOUR Operating Instructions © 2013 Magnetrol International all rights reserved
Flange preparation
Prior to the installation of the CONTOUR, an installation flange should be
prepared. The flange must have a 52mm (2.05
”
) hole for the scanner body
thread insertion.
CONTOUR provides two types of standard flanges. Please refer to
page 31:
Appendix B: Accessories
for flange specifications.
Installing the Flange
Verify existence of
the O-Ring on the
neck tube remains
in place as shown:
Use an adjustable 18"
wrench to untighten
and remove the nut
from the neck tube.
Place flange over the neck tube,
insert until placed as shown:
Replace the nut and tighten it over
the neck tube to the flange, using
an adjustable 18" wrench.
Make sure the
scanner is well
tightened to the
flange, for
vibrations
prevention and proper sealing.
When mounting the scanner body
and flange to the silo standpipe
make sure the scanner is facing the
center of the silo as described in
Scanner Orientation on page 11
.
Installing the Scanner Head
Unpack the scanner head.
Untighten the four screws of the housing rear panel
using a 4mm hex key, and remove the rear panel. The
screws are of captive type and will not fall off.
1
2
3
4
1