Operation Instructions
MBE35_50 OPERATION MANUAL 2005_10
-
11
-
7. Using a pencil, mark the location of the mounting holes on the concrete. (See fig.
S0112 for dimensions).
8. Drill all four mounting holes and insert the bolts. (Please refer to anchor bolt
manufacturers installation specifications). Make sure that the bolts stand up at
least 2 inches above the concrete surface.
9. Place the gate on top of the previous marked area.
10. Using the supplied U-channel (in accessory box) secure the gate to the concrete
(see Fig. S0106).
1 barrier housing
2
nut
3 lock washer
4 small flat washer
5 large flat washers
6 anchor bolt
7 U-rail
8 concrete foundation
1
2
3
4
5
6
7
8
S0106
Abb,S0106
Mounting the barrier housing to the
foundation
7
"
7.5"
14"
12
4 x Mounting Holes
Housing
S0112