RS 350 M / MW PRO - RS 450 M / MW PRO - RS 550 M / MW PRO
• If you will use the gas cylinder on the gas cylinder transport platform on the machine, place the gas cylinder here and secure it with a chain.
• If you will not place the gas cylinder on the machine, secure the gas cylinder to the wall with a chain.
• Use safety regulators and heaters according to the standards for work safely to achieve the best results.
• Make sure the size of the hose connection of the gas regulator you are using is 3/8” (9.5mm).
• Open the gas cylinder valve keeping your head and face away from the outlet of the valve and keep it open for 5 seconds. By this means, possible
sediment and impurities will be discharged.
• If the CO2 heater is to be used, first connect the CO2 heater to the gas cylinder. After connecting the gas regulator to the CO2 heater, insert the plug
of the CO2 heater into the CO2 heater outlet on the back of the machine.
• If the CO2 heater will not be used, connect the gas regulator directly to the gas cylinder.
• Connect one end of the tube hose to the gas regulator and tighten the clamp. Connect the other end to the gas inlet at the back of the machine and
tighten the nut.
• Open the gas cylinder valve to check that the tube is full and that there are no leaks in the gas flow path. If you hear a noise and/or detect a smell of
gas as a leak indicator, examine your connections and eliminate leakage.
1-
Chain
2-
Gas Regulator
3-
Gas Cylinder
4-
Gas Cylinder Valve
5-
Flow Adjustment Valve
6-
Gas Hose
7-
Flow meter
8-
Manometer
9-
CO2 Heater
10-
CO2 Heater Energy Cable
2.4.5 Gas Connections
Figure 10 : Gas Cylinder - Heater - Regulator Connections
1
2
3
4
5
6
7
8
9
10
Installation