6-51
8.4 CHECKING AFTER CRANE OPERATION
• When the operation of the Crane is finished, always turn OFF the Transmitter and Receiver
power.
• On no occasion except for Crane operations, must the power of the Transmitter be turned ON.
That could cause an un-expected motion of the Crane and result in a serious hazard, such that
the Crane hitting someone or an object, or the Crane could tip.
• When it is required to turn ON the Transmitter for the purpose of inspection or such, ensure
first that the engne is not running, then shut down the Receiver by turning OFF its main switch.
1. Enter into the “CRANE MODE” of the Transmitter operation mode.
2. Use the operation levers and retract the boom to its shortest condition and lower it to the base position.
NOTES
Stowing the hook block is available only by using the control lever and switch on the crane.
3. Enter into the “OUTRIGGER MODE” of the Transmitter operation mode.
4. Use the operation levers and stow all the outriggers so that the Crane is configured to the travelling
position.
5. Stop the engine and turn OFF the Transmitter power.
6. Shut down the power of the Receiver by turning its Main switch to the OFF position.
7. Maintain the Transmitter and Receiver as follows:
(1) Check operation levers and the Accelerator lever for any faults.
(2) Remove oil or other soil by a clean cloth.
(3) Repair all the cracks or damages without fail.
8. Put the transmitter into the accessory storage case and keep it in the dry and cool place where the wind
and rain or direct sun light is sheltered.
Summary of Contents for MC-174CRM
Page 2: ......
Page 8: ...0 6...
Page 60: ...2 38 31 Precautions for use portable card 101 2141000...
Page 62: ...2 40...
Page 77: ...3 15...
Page 117: ...3 55 5 Push the choke knob forward to return the original position...
Page 195: ...4 23...
Page 197: ...4 25...
Page 214: ...5 4 2 OVERALL DIMENSIONS...
Page 215: ...5 5 3 OUTRIGGER SPREAD DIMENSIONS...
Page 219: ...5 9 5 WORKING RANGE...
Page 220: ...5 10...