
3-46
2.1.3 CHECKS AFTER STARTING THE ENGINE
Check the followings in this section after starting the engine and before starting work every day.
CAUTION
The checks described in this section should be carried out after starting the machine.
Refer to "Operation 2.2 Starting the Engine" and later to execute the engine startup, travelling
operations, outrigger operations and crane operations.
[1] CHECKING/ADJUSTING RUBBER TRACK TENSION
CAUTION
• Set the outriggers and raise the rubber track for about 50 mm from the ground when
checking/adjusting the tension of the rubber tracks.
• The standard tension of the rubber track is that the clearance between the wheel tread of the
track roller at centre and the shoulder of the rubber track is 5 to 10 mm.
• If the tension is not sufficient even after injecting the grease, the rubber track or the sealing of
the tension adjustment cylinder needs to be changed.
Contact us or our sales service agency for the judgement of whether to replace, repair, or keep
the rubber track.
The rubber tracks are worn out differently depending on the working conditions and ground quality.
Regularly check the wear and tension of the rubber tracks.
Especially, with the new machine or when a new part was installed, “initial slack” appears with 5 to 30
hours of driving after adjusting the tension to the specified value.
Adjust the tension frequently until the perio
d of “initial slack” passes. This will prevent “rubber track from
coming off due to insufficient tension on the rubber track”.
[TENSION CHECK]
1. Move the left and right crawlers so that the junction of the rubber
track (indicated by M) comes to the top centre between the
axles.
2. See “Operation 2.13 Outrigger Set Up Operation” to set the
outriggers and raise the crawlers for About 50mm from the
ground.
3. Measure the clearance between the wheel tread of the track
roller at centre and the shoulder of the rubber track.
NOTES
The clearance of 5 to 10 mm indicates the standard tension.
4. If the tension is out of the standard range, see the section
of
tension adjustment on the next page to make adjustments.
Summary of Contents for MC-174CRM
Page 2: ......
Page 8: ...0 6...
Page 60: ...2 38 31 Precautions for use portable card 101 2141000...
Page 62: ...2 40...
Page 77: ...3 15...
Page 117: ...3 55 5 Push the choke knob forward to return the original position...
Page 195: ...4 23...
Page 197: ...4 25...
Page 214: ...5 4 2 OVERALL DIMENSIONS...
Page 215: ...5 5 3 OUTRIGGER SPREAD DIMENSIONS...
Page 219: ...5 9 5 WORKING RANGE...
Page 220: ...5 10...