background image

 

CABINET.  CONTROL  MODULE,  POWER,  AND  SIGNAL  CABLE  CONNECTIONS  ARE 
ACCESSED ON THE BACK OF THE SCOREBOARD 

 

MOUNTING THE SCOREBOARD 

 

NOTE: IF THE POLES/I-BEAMS ARE NOT IN ALIGNMENT --- SHIMS MAY BE 
NEEDED TO MOUNT THE SCOREBOARD PROPERLY. MOUNTING THE 
SCOREBOARD WITH THE POLES/I-BEAMS OUT OF ALIGNMENT MAY DAMAGE 
THE SCOREBOARD AND VOID THE WARRANTY. 
 

1. 

Attach the Mounting Flat Stock to the scoreboard using the provided 3/8” hardware, as 
shown below. 

2.  Using the lift holes provided, connect a lift device to the scoreboard, as in the image below. 

 

                    

                                            

 

 

3.  Lift the scoreboard into place to the desired height, ensuring that the scoreboard is level.    

 

4.  Secure  the  scoreboard  to  the  poles/beams  using  the  mounting  flanges  attached  to  the 

scoreboard. The unit must be attached to each pole/beam on top 

and

 

bottom.  

 

5.  If  using  steel  I-beams,  either  weld  the  mounting  flanges  to  the  supports,  or  drill  the 

mounting flanges and supports to use bolts, washers, and nuts to secure the scoreboard to 
the I-beams.  
 

6.  If galvanized steel poles are being used, weld or bolt steel angles to the mounting flanges, 

which  can  then  be  welded  to  or  bolted 

through

  the  pole.  Refer  to  the  figure  below  for 

detailed illustrations of these suggested mounting methods. 

 

Summary of Contents for Legacy Series

Page 1: ...1 INSTALLATION INSTRUCTIONS FOR SMALL BASEBALL SCOREBOARD Model MSB3003L5CP...

Page 2: ...TIONS 4 DETERMINING LOCATION AND ORIENTATION 5 INSTALLING MOUNTING POLES OR I BEAMS 5 MOUNTING THE SCOREBOARD 6 INSTALLING THE SPORT PANELS 7 ATTACHING THE CRISS CROSS BATS 9 RUNNING AND CONNECTING TH...

Page 3: ...1 Keyboard carrying case 1 CD ROM including installation operation maintenance warranty and support information Cable controlled systems standard 1 20 ft control cable 1 Junction box cover with built...

Page 4: ...x return warranty activation sheet to Scoreboard Service Company at 270 753 3773 PRODUCT SPECIFICATIONS Overall Dimensions Main Cabinet 48 tall x 72 long x 8 deep shipped in two 2 sections Weight Hang...

Page 5: ...on including footer specifications above ground height and total length of the poles I beams 1 Install the two 2 mounting poles I beams supplied by the customer on the field with a 4 center spacing an...

Page 6: ...board as in the image below 3 Lift the scoreboard into place to the desired height ensuring that the scoreboard is level 4 Secure the scoreboard to the poles beams using the mounting flanges attached...

Page 7: ...4 8 braces 2 each for side panels 2 20 x 1 bolts 16 3 8 x 1 bolts 32 3 8 flat washers 16 3 8 nuts 1 Place the top Sport panel onto the scoreboard by lining up a corner at one end and slipping the pan...

Page 8: ...anel The support braces bolt to the back of the Sport panel and to the top flange of the scoreboard using 3 8 x 1 1 2 bolts flat washers and nuts 3 Install the two side Sport panels support braces and...

Page 9: ...HE CRISS CROSS BATS PARTS 1 2 handles with attached braces 2 2 barrels with attached braces 3 4 braces look like a triangle with studs for mounting the bats 4 4 20 wing nuts approximately 32 5 Self ta...

Page 10: ...e barrels to the angle brackets 3 Attach the braces on each barrel to the angle brackets and secure them 4 Attach the angle brackets on the bottom outside corners of the scoreboard the same as you att...

Page 11: ...electrical service The control cable should run from the scoreboard to a location that is within 10 feet of the scorekeeper s location and into a 2 X4 wall box NOTE IF THE WIRES IN YOUR CABLE DO NOT C...

Page 12: ...the wires in the cable as that on the wires on the back of the wall plate Follow the chart if possible but more importantly whatever the match up is at the wall plate should also be the match up at t...

Page 13: ...CE AND CONNECT IT TO THE SCOREBOARD A WATERTIGHT NON FUSIBLE DISCONNECT SWITCH A 20 AMP GROUND FAULT INTERRUPTER AND A SAFETY GROUND SHOULD BE INSTALLED FOR THE 20 AMP CIRCUIT CONNECTED TO THE SCOREBO...

Page 14: ...14...

Page 15: ...s software version When the display changes and reads SELECT DIAG MODE DIGIT TEST press ENTER The LCD will now read SEGMENT TEST SEGMENTS OFF Pressing the UP arrow located on the far right of the con...

Page 16: ...______________ Date Installation Completed _________________________________ Company or Person Responsible For Installation address phone number ________________________ This document confirms that th...

Reviews: