background image

 

TABLE OF CONTENTS 

 
 

 

DESCRIPTION   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

INSTRUCTIONS FOR REPORTING SHIPPING DAMAGE 

 

 

 

 

 

 

 

 

 
 

INSTALLATION OVERVIEW   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

PRODUCT SPECIFICATIONS 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

DETERMINING LOCATION AND ORIENTATION   

 

 

 

 

 

 

 

 

 

 

 
 

INSTALLING MOUNTING POLES OR I-BEAMS   

 

 

 

 

 

 

 

 

 

 

 
 

MOUNTING THE SCOREBOARD 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

INSTALLING THE SPORT PANELS   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

ATTACHING THE CRISS CROSS BATS 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

RUNNING AND CONNECTING THE CONTROL CABLE   

 

 

 

 

 

 

 

 

11 

 
 

RUNNING AND CONNECTING THE ELECTRIC SERVICE   

 

 

 

 

 

 

 

13 

 
 

TESTING THE INSTALLED SYSTEM 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15 

 
 

WARRANTY ACTIVATION 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Legacy Series

Page 1: ...1 INSTALLATION INSTRUCTIONS FOR SMALL BASEBALL SCOREBOARD Model MSB3003L5CP...

Page 2: ...TIONS 4 DETERMINING LOCATION AND ORIENTATION 5 INSTALLING MOUNTING POLES OR I BEAMS 5 MOUNTING THE SCOREBOARD 6 INSTALLING THE SPORT PANELS 7 ATTACHING THE CRISS CROSS BATS 9 RUNNING AND CONNECTING TH...

Page 3: ...1 Keyboard carrying case 1 CD ROM including installation operation maintenance warranty and support information Cable controlled systems standard 1 20 ft control cable 1 Junction box cover with built...

Page 4: ...x return warranty activation sheet to Scoreboard Service Company at 270 753 3773 PRODUCT SPECIFICATIONS Overall Dimensions Main Cabinet 48 tall x 72 long x 8 deep shipped in two 2 sections Weight Hang...

Page 5: ...on including footer specifications above ground height and total length of the poles I beams 1 Install the two 2 mounting poles I beams supplied by the customer on the field with a 4 center spacing an...

Page 6: ...board as in the image below 3 Lift the scoreboard into place to the desired height ensuring that the scoreboard is level 4 Secure the scoreboard to the poles beams using the mounting flanges attached...

Page 7: ...4 8 braces 2 each for side panels 2 20 x 1 bolts 16 3 8 x 1 bolts 32 3 8 flat washers 16 3 8 nuts 1 Place the top Sport panel onto the scoreboard by lining up a corner at one end and slipping the pan...

Page 8: ...anel The support braces bolt to the back of the Sport panel and to the top flange of the scoreboard using 3 8 x 1 1 2 bolts flat washers and nuts 3 Install the two side Sport panels support braces and...

Page 9: ...HE CRISS CROSS BATS PARTS 1 2 handles with attached braces 2 2 barrels with attached braces 3 4 braces look like a triangle with studs for mounting the bats 4 4 20 wing nuts approximately 32 5 Self ta...

Page 10: ...e barrels to the angle brackets 3 Attach the braces on each barrel to the angle brackets and secure them 4 Attach the angle brackets on the bottom outside corners of the scoreboard the same as you att...

Page 11: ...electrical service The control cable should run from the scoreboard to a location that is within 10 feet of the scorekeeper s location and into a 2 X4 wall box NOTE IF THE WIRES IN YOUR CABLE DO NOT C...

Page 12: ...the wires in the cable as that on the wires on the back of the wall plate Follow the chart if possible but more importantly whatever the match up is at the wall plate should also be the match up at t...

Page 13: ...CE AND CONNECT IT TO THE SCOREBOARD A WATERTIGHT NON FUSIBLE DISCONNECT SWITCH A 20 AMP GROUND FAULT INTERRUPTER AND A SAFETY GROUND SHOULD BE INSTALLED FOR THE 20 AMP CIRCUIT CONNECTED TO THE SCOREBO...

Page 14: ...14...

Page 15: ...s software version When the display changes and reads SELECT DIAG MODE DIGIT TEST press ENTER The LCD will now read SEGMENT TEST SEGMENTS OFF Pressing the UP arrow located on the far right of the con...

Page 16: ...______________ Date Installation Completed _________________________________ Company or Person Responsible For Installation address phone number ________________________ This document confirms that th...

Reviews: