214880
144
Revision A
Figure 4.172: Left Side of Conditioner
–
Right Side Similar
9.
Torque nuts (A) to 170 Nm (126 lbf
∙
ft) on both sides of the
conditioner.
Figure 4.173: Conditioner Driveline
–
Left Side
of Header
NOTE:
Ensure feed roll rotates freely and that there is sufficient
clearance between the feed roll pulley (C) and frame for belt
removal before installing driveline.
10. Apply an anti-seize compound to splined shaft (D) if
necessary, and install spring lock quick coupling yoke of
driveline (B) as shown.
NOTE:
Anti-seize compound is applied to splined shaft of driveline
before leaving the factory.
11. If conditioner driveline (B) was removed from conditioner,
secure driveline to the conditioner with a M12 hex head
bolt (A), washer, and hex flange center lock nut. Torque
bolt (A) to 69 Nm (51 lbf
∙
ft).
12. Remove the lifting chains from the conditioner and move
the lifting device clear of the work area.
Figure 4.174: Header Support Deflector
–
Left Side
of Header
13. Position the header support deflector (B) onto the header
support as shown, and install three M10 short square neck
carriage head bolts (A) and hex flange nuts. Bolt heads face
inboard.
14. Torque bolts (A) to 53 Nm (39 lbf
∙
ft).