HEADER OPERATION – A SERIES
Form 169469/169470/169471
107
Revision C
6.6.2 HEADER DETACHMENT
a. Raise the header fully with the HEADER UP
switch on the GSL. Stop engine and remove
key.
DANGER
To avoid bodily injury from fall of raised
header, always engage header lift cylinder
stops when working on or around raised
header.
b. Engage lift cylinder stops on both lift cylinders.
Refer to Section 6.4.1 Header Lift Cylinder
Stops.
c. Remove hairpin from pin (A), and remove pin
from left and right header boots (B) on header.
d. Lower stand (C) by pulling pin (D), inverting
stand and re-locating on bracket. Reinsert pin
(D) and secure with hairpin.
e. Remove pin from linkage (E) to disengage float
springs, and insert in storage hole (F). Secure
with lynch pin. Repeat for opposite linkage.
IMPORTANT
To prevent damage to the lift system when
lowering header lift linkages without a
header or weight box attached to
windrower, ensure that float engagement
pin is installed in storage location (F), and
not
installed at hole location (E).
f. Disengage lift cylinder stops.
g. Start engine, choose a level area and lower
header to the ground.
(continued next page)
E
F
HEADER UP
HEADER TILT UP
HEADER DOWN
HEADER
TILT DOWN
C
D
A
B
Summary of Contents for M205 2010
Page 1: ...M205 Self Propelled Windrower OPERATOR S MANUAL Revision C Part 169469 25...
Page 51: ...OPERATOR S STATION Form 169469 169470 169471 49 Revision C continued next page...
Page 95: ...HEADER OPERATION D SERIES Form 169469 169470 169471 93 Revision C continued next page...
Page 181: ...MAINTENANCE SERVICE Form 169469 169470 169471 179 Revision C 7 10 13 3 Fuse Box Decal...