HEADER OPERATION – D SERIES
Form 169469/169470/169471
96
Revision C
i. Disconnect reel hydraulics (H) and store on
bracket at windrower LH side.
j. Start engine and activate HEADER TILT cylinder
switch on GSL to release load on center link
cylinder.
k. Lift release (M).
l. Operate the link lift cylinder with REEL UP
switch on GSL to disengage the center link from
the header.
m. Slowly back windrower away from header.
NOTE
If hay conditioner is installed, watch
clearances on both sides.
n. Reinstall pin (A) into header leg and secure with
hairpin.
M
H
HEADER TILT UP
HEADER
TILT DOWN
REEL UP
REEL DOWN
A
Summary of Contents for M205 2010
Page 1: ...M205 Self Propelled Windrower OPERATOR S MANUAL Revision C Part 169469 25...
Page 51: ...OPERATOR S STATION Form 169469 169470 169471 49 Revision C continued next page...
Page 95: ...HEADER OPERATION D SERIES Form 169469 169470 169471 93 Revision C continued next page...
Page 181: ...MAINTENANCE SERVICE Form 169469 169470 169471 179 Revision C 7 10 13 3 Fuse Box Decal...