PRE-DELIVERY INSPECTION
Form # 169007
Model Year - 2009
20
STEP 11. PRE-DELIVERY
INSPECTION
IMPORTANT
To avoid machine damage, check
that no shipping dunnage has fallen
into machine.
Perform the final checks as listed on the "Pre-
Delivery Checklist" (yellow sheet attached to
this instruction) to ensure the machine is field-
ready. Refer to the following pages for detailed
instructions as indicated on the checklist.
IMPORTANT
The machine has been set at the
factory and should require no further
adjustments. However, perform the
following checks to ensure your
machine will provide maximum
performance. Adjustments should be
made
only if absolutely necessary
and in accordance with the
instructions in this manual.
The completed checklist should be retained
either by the operator or the dealer.
A. TIRE PRESSURE (TRANSPORT &
STABILIZER WHEEL OPTIONS)
Check tire inflation pressure. If necessary,
inflate as per following table.
YR
TIRE
SIZE
PRESSURE
2006 &
EARLIER
GOODYEAR
WRANGLER
RT/S
205-75
R15
40 psi (276
kPa)
2007 &
LATER
CARLISLE &
TITAN
ST205/75
R15
65 psi (448
kPa)
IMPORTANT
Do not exceed maximum pressure
specified on tire side wall.
B. WHEEL BOLT TORQUE
(TRANSPORT & STABILIZER WHEEL
OPTIONS)
Check wheel bolt torque is 80-90 ft-lbf (110-120
N∙m). Refer to bolt tightening sequence
illustration.
C. WOBBLE BOX
a. Position of plug (A) and breather (B) at wobble
box must be as shown.
b. Check oil level.
(continued next page)
BETWEEN LOWER HOLE
AND END OF DIPSTICK
CHECK OIL LEVEL WITH TOP OF WOBBLE BOX
HORIZONTAL
A
B
1
2
3
4
5
6