3.i) PISTONS WORKING TIME PROGRAMMING:

              PROCEDURE:

          

1) Push and keep pushed the PROG  button (the led OK and the led EXT are on, fixed)   

          2) After about 3 seconds, the led OK starts flashing 

          3) Release the PROG button, the led OK keeps on flashing

          4)  open the contact f2(4) for the time you wish to memorize    

          5) When the contact F2(4)  is closed, the led OK turns off and the procedure is finished

3.l) CLOCK PROGRAMMING:

to program the clock, the DIP1 must in on.

note: connect the clock contact without tension in place of the CH input (terminals 5-7).

thanks to this function, the road will be open until the contact of the clock is closed and it will close when the 

clock contact is open.

In case of power failure, at the revival of power the central guarantees the reopening or the reclosing even if the 

clock has commuted while the central was off.

When the clock contact is closed, the pause management is excluded. If during the automatic reclosing of the 

clock,  the security f2(4) intervenes, the bollard reopens and it will try to reclose after 5minutes the closing 

attempts will continue until the bollard isn’t closed or coming a user’s command.

3.m) ACTIVATION OF HYDRAULIC PRESSURE RETENTION:

to activate this function, DIP 2 must be in “on”.

When the system is in CLoSe state, the control board check the position of closing limit switches. 

          If the limit switches have inverted their state, due to pistons lowering, the control board commands the closing of   

the bollard. the control is done every 10 minutes and the forced closing lasts up to the reaching of the limit switches 

or to a maximum of 3 seconds. Before the forced closing the bollard makes some signalling flashes. The flashing 

light doesn’t work during the forced closing. During the forced closing the safeties f2(4) don’t order the inversion but 

only the stop.

3.n) EXCLUSION OF THE DELAY TIME OF THE LIMIT SWITCHES:

Usually, the engines stop after 250ms from the opening of the contact of the limit switches. thanks to this 

procedure it is possible to exclude the delay letting stop the engines as soon as the limit switch contact is open. 

It turns on placing the DIP4 in on.

Summary of Contents for BRAIN1

Page 1: ...Brain_1_08 190722 CONTROL BOARD BRAIN1 GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Installing Company information Timbre Signature ...

Page 2: ..._ 4 2 0 TECHNICAL NOTES________________________________________________________ 6 3 0 PROGRAMMING FUNCTIONING___________________________________________ 7 4 0 SAFETY WARNINGS FOR MAINTENANCE AND USE___________________________ 10 WARRANTY__________________________________________________________________ 11 Guide for the causes research of some drawbacks_____________________ 11 GBR ...

Page 3: ...in series on SIC1 Ci riserviamo la proprietà di questo disegno con divieto di diffonderlo o riprodurlo senza nostra autorizzazione TRIMMER SEMPRE A POTENZA MASSIMA TRIMMER SEMPRE A POTENZA MASSIMA LAMPEGGIATORE V GBR CONTROL BOARD Antenna LED EXT COMMANDs INPUT ACCESSORIES TRAFFIC LIGHT ELECTRICAL VALVE POWER SUPPLY ENGINE Before the installation please read carefully this manual The company decli...

Page 4: ...mon 8 CONNECTION OF CONTROL BOARD OUTPUTS TERMINAL NOTES POWER SUPPLY OF AUXILIARY ACCESSORIES 13 24Vac MAX280mA 14 LED BRIGHT HEADS BOLLARDS is recommended to install a diode 13 24Vac 15 TRAFFIC LIGHT WITH TWO LIGHTS red green MAX 300W 16 GREEN LIGHT 17 RED LIGHT 18 COMMON neutral ELECTRIC VALVE 17 230Vac 160W ENGINE1 OPENING PHASE 22 230Vac MAX500W COMMON 23 CLOSING PHASE 24 500W MAX FOR ENGINE ...

Page 5: ...RONYM LED The LED diagnosis state has been realized at the first ignition of 1 column of the bollard totally lowered It lights when there is electrical network ON ON LED for control board programming It flashes for few seconds It is turned off during the functioning OK OFF It lights up when the button is pushed F1 6 OFF It flashes when the button clock is pushed F1A 7 OFF It turns off when the sto...

Page 6: ...SITIVE HEAD 24F 13 15 It has been projected to supply 1 flashing bright head 2 h INSTALLATION The control board must be installed in a protected and dry place with its own protection box Install a circuit breaker of type 0 03A high sensitivity to the supply of the control board Make sure the supply of the control board is 230Vac 10 50Hz For the control board electrical motor flashing light traffic...

Page 7: ...he code To match the radio command with STOP function activate the input STOP 3 open the contact while sending the code 3 d CANCELLATION SINGLE RADIO CODE PROCEDURE 1 Push twice the PROG button The LED OK is fixed ON while the LEDs EXT flash 2 Send the radio code to be cancelled 3 If the led OK flashes 3 times the code has been cancelled Instead if it flashes 1 time slowly it means that the radio ...

Page 8: ...me of traffic light is the available time for a vehicle to cross and free the passage since when the traffic light is red until the bollard starts its climb Meanwhile the leds incorporated in the head keep flashing see image A at page 8 point 5 In order to define the waiting time it is necessary to time how much a vehicles takes for crossing and freeing the passage see image A at page 8 PROCEDURE ...

Page 9: ...e clock the security F2 4 intervenes the bollard reopens and it will try to reclose after 5minutes The closing attempts will continue until the bollard isn t closed or coming a user s command 3 m ACTIVATION OF HYDRAULIC PRESSURE RETENTION To activate this function DIP 2 must be in ON When the system is in CLOSE state the control board check the position of closing limit switches If the limit switc...

Page 10: ...t the procedure 3 o RADIO REMOTE CONTROL PROGRAMMING 4 0 SAFETY WARNINGS FOR MAINTENANCE AND USE WARNINGS These warnings are integral and essential parts of the electronics and they are to be given to the final user So it is necessary to keep this manual Read carefully the instruction book which gives important indications about the installation The wrong installation or the improper use of the co...

Page 11: ...ation reversed limit switches lack of power supply control board damaged fuses damaged wrong connection of electrical engine wrong limit switch connection sectional swtich open control board damaged high absorption peak short circuit on the engine electrical valve inputs output24Vac traffic light rewire the electrical engine on the control board reverse rise fall wires rewire magnetic limit switch...

Page 12: ...m V R Com Com A C Stop blocco SIC1 Electrical valve 230V FC A M1 FC C WARNING The limit switches of the head must be connected in series on SIC1 Ci riserviamo la proprietà di questo disegno con divieto di diffonderlo o riprodurlo senza nostra autorizzazione TRIMMER SEMPRE A POTENZA MASSIMA TRIMMER SEMPRE A POTENZA MASSIMA LAMPEGGIATORE A C Com FC A M1 FC C LTL R SDL SIC 1 V GBR ...

Page 13: ...info mac srl it 13 Brain_1_08 190722 COMMON BRAIN GBR ...

Page 14: ...serviamo la proprietà di questo disegno con divieto di diffonderlo o riprodurlo senza nostra autorizzazione 12 11 10 9 8 7 6 5 4 3 2 1 POWER SUPPLY 13 14 15 16 L1 L1 R2 R1 MAGNETIC COIL Connection in series with the other securities connected on this clamp GBR ...

Page 15: ...info mac srl it 15 Brain_1_08 190722 GBR ...

Page 16: ...16 www mac srl it Brain_1_08 190722 GBR ...

Reviews: