Page 1: ...Brain_1_08 190722 CONTROL BOARD BRAIN1 GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Installing Company information Timbre Signature ...

Page 2: ..._ 4 2 0 TECHNICAL NOTES________________________________________________________ 6 3 0 PROGRAMMING FUNCTIONING___________________________________________ 7 4 0 SAFETY WARNINGS FOR MAINTENANCE AND USE___________________________ 10 WARRANTY__________________________________________________________________ 11 Guide for the causes research of some drawbacks_____________________ 11 GBR ...

Page 3: ...in series on SIC1 Ci riserviamo la proprietà di questo disegno con divieto di diffonderlo o riprodurlo senza nostra autorizzazione TRIMMER SEMPRE A POTENZA MASSIMA TRIMMER SEMPRE A POTENZA MASSIMA LAMPEGGIATORE V GBR CONTROL BOARD Antenna LED EXT COMMANDs INPUT ACCESSORIES TRAFFIC LIGHT ELECTRICAL VALVE POWER SUPPLY ENGINE Before the installation please read carefully this manual The company decli...

Page 4: ...mon 8 CONNECTION OF CONTROL BOARD OUTPUTS TERMINAL NOTES POWER SUPPLY OF AUXILIARY ACCESSORIES 13 24Vac MAX280mA 14 LED BRIGHT HEADS BOLLARDS is recommended to install a diode 13 24Vac 15 TRAFFIC LIGHT WITH TWO LIGHTS red green MAX 300W 16 GREEN LIGHT 17 RED LIGHT 18 COMMON neutral ELECTRIC VALVE 17 230Vac 160W ENGINE1 OPENING PHASE 22 230Vac MAX500W COMMON 23 CLOSING PHASE 24 500W MAX FOR ENGINE ...

Page 5: ...RONYM LED The LED diagnosis state has been realized at the first ignition of 1 column of the bollard totally lowered It lights when there is electrical network ON ON LED for control board programming It flashes for few seconds It is turned off during the functioning OK OFF It lights up when the button is pushed F1 6 OFF It flashes when the button clock is pushed F1A 7 OFF It turns off when the sto...

Page 6: ...SITIVE HEAD 24F 13 15 It has been projected to supply 1 flashing bright head 2 h INSTALLATION The control board must be installed in a protected and dry place with its own protection box Install a circuit breaker of type 0 03A high sensitivity to the supply of the control board Make sure the supply of the control board is 230Vac 10 50Hz For the control board electrical motor flashing light traffic...

Page 7: ...he code To match the radio command with STOP function activate the input STOP 3 open the contact while sending the code 3 d CANCELLATION SINGLE RADIO CODE PROCEDURE 1 Push twice the PROG button The LED OK is fixed ON while the LEDs EXT flash 2 Send the radio code to be cancelled 3 If the led OK flashes 3 times the code has been cancelled Instead if it flashes 1 time slowly it means that the radio ...

Page 8: ...me of traffic light is the available time for a vehicle to cross and free the passage since when the traffic light is red until the bollard starts its climb Meanwhile the leds incorporated in the head keep flashing see image A at page 8 point 5 In order to define the waiting time it is necessary to time how much a vehicles takes for crossing and freeing the passage see image A at page 8 PROCEDURE ...

Page 9: ...e clock the security F2 4 intervenes the bollard reopens and it will try to reclose after 5minutes The closing attempts will continue until the bollard isn t closed or coming a user s command 3 m ACTIVATION OF HYDRAULIC PRESSURE RETENTION To activate this function DIP 2 must be in ON When the system is in CLOSE state the control board check the position of closing limit switches If the limit switc...

Page 10: ...t the procedure 3 o RADIO REMOTE CONTROL PROGRAMMING 4 0 SAFETY WARNINGS FOR MAINTENANCE AND USE WARNINGS These warnings are integral and essential parts of the electronics and they are to be given to the final user So it is necessary to keep this manual Read carefully the instruction book which gives important indications about the installation The wrong installation or the improper use of the co...

Page 11: ...ation reversed limit switches lack of power supply control board damaged fuses damaged wrong connection of electrical engine wrong limit switch connection sectional swtich open control board damaged high absorption peak short circuit on the engine electrical valve inputs output24Vac traffic light rewire the electrical engine on the control board reverse rise fall wires rewire magnetic limit switch...

Page 12: ...m V R Com Com A C Stop blocco SIC1 Electrical valve 230V FC A M1 FC C WARNING The limit switches of the head must be connected in series on SIC1 Ci riserviamo la proprietà di questo disegno con divieto di diffonderlo o riprodurlo senza nostra autorizzazione TRIMMER SEMPRE A POTENZA MASSIMA TRIMMER SEMPRE A POTENZA MASSIMA LAMPEGGIATORE A C Com FC A M1 FC C LTL R SDL SIC 1 V GBR ...

Page 13: ...info mac srl it 13 Brain_1_08 190722 COMMON BRAIN GBR ...

Page 14: ...serviamo la proprietà di questo disegno con divieto di diffonderlo o riprodurlo senza nostra autorizzazione 12 11 10 9 8 7 6 5 4 3 2 1 POWER SUPPLY 13 14 15 16 L1 L1 R2 R1 MAGNETIC COIL Connection in series with the other securities connected on this clamp GBR ...

Page 15: ...info mac srl it 15 Brain_1_08 190722 GBR ...

Page 16: ...16 www mac srl it Brain_1_08 190722 GBR ...