21
maintaining a small upward ascending angle. Sharp turns should also be avoided, and
elbows ought to be kept to a minimum.
It is forbidden to install any heat exchangers, this in order to ensure the optimal utilisation of
flue gas heat. The entirety of work, as well as the licence for connecting the boiler to the flue
duct, must be arranged and agreed with the competent professional organisation and
executed thereby.
ATTENTION!
It is forbidden to connect any other appliances to the flue duct used by the boiler, or
to utilise it for any additional purposes (e.g. ventilation).
ATTENTION!
The chimney stack should be constructed in accordance with the standards and
regulations in force at the location of installation of the boiler.
DEAR USER!
LUMO TECHNIKA GRZEWCZA SHALL NOT BE HELD LIABLE FOR ANY DAMAGE
RESULTING FROM THE IMPROPER INSTALLATION OF THE BOILER OR FAILURE TO
OBSERVE THE CONDITIONS AND GUIDELINES SET FORWARD IN THE PRESENT
INSTRUCTION.
5.
OPERATION
5.1. Preparations for start–up of the boiler
Before proceeding with the initial start–up of the boiler, it is necessary to perform a
fresh inspection of the appliance and its ancillary devices, and in particular:
•
to carry out an internal inspection of the boiler – water filling inspection,
•
to carry out an inspection of moving elements, particularly those which operate under
pressure, and also to close all doors, washout holes, etc.
•
to inspect all valves (in particular the deaerating valves which account for the
operational safety of the appliance),
•
to verify the technical condition of secondary, measurement and regulating devices,
including burner and boiler automatics,
•
to carry out a visual inspection of the external condition of the boiler – its housing,
insulation, etc.
•
to inspect the condition and correctness of execution of all systems cooperating with
the boiler – the chimney stack, the ventilation system, the electrical system and the
fuel system,
•
to inspect the pressure in the system, and increase it if necessary,
•
to verify fulfilment of industrial work safety and fire safety requirements at the point of
installation of the boiler,
•
to check the fuel level in the tank and add fuel if necessary.
If all the guidelines have been fulfilled and the appropriate burner has been correctly fitted to
the boiler, the initial start–up may be proceeded with.
Summary of Contents for BIO-MAX PLUS
Page 8: ...8 Figure No 2 Component elements of the boiler Figure No 2 Component elements of the boiler...
Page 9: ...9...
Page 10: ...10 3 2 Technical parameters Figure No 3 Boiler installation dimensions...
Page 16: ...16 Figure No 7 Wiring diagram ecoMAX860P Standard and ecoMAX860P Touch...
Page 29: ...29...