Lumo BIO-MAX PLUS User Manual And Installation Manual Download Page 7

 

7

3. 

DESCRIPTION OF THE APPLIANCE 

 
 

Bio-max  Plus  steel  water  heating  boilers  intended  for  use  with  wood  pellet  powered 

burners  are  among  the  most  modern  solution  heating  appliances  fired  with  ecological 
renewable fuels. They are an excellent source of heat for the heating of houses, workshops 
and other low–capacity structures, fulfilling the demands of users who demand that modern 
boilers require only minimum service and maintenance (the appliances are fully automated) 
while  ensuring  a  high  level  of  comfort  and  low  operating  costs.  The  design  of  the  boiler  is 
based  on  a  system  of  smoke  tubes  and  reversal  chambers  (triple–pass  design),  which 
ensures high combustion efficiency of the appliance and minimises chimney stack loss. The 
exchanger  and  combustion  chamber  are  made  from  high–grade,  certified  steel  sheet.  The 
front  of  the  boiler  is  fitted  with  a  closing  three–way  diaphragm,  which  is  used  both  for 
installing the burner and cleaning the combustion chamber. In the rear of the boiler is a steel 
smoke conduit which is used to connect the boiler to the flue gas duct, while in the upper part 
is  a  large  and  easily  accessible  washout  hole,  which  facilitates  cleaning  of  the  heat 
exchanger and the smoke tubes. A tray for ash is located in the bottom part of the boiler. Ash 
generated during the combustion process fall directly onto the tray, from which they can be 
easily and rapidly removed. Furthermore, all boilers are fitted as standard with a fuel storage 
bin, which can be attached either to the left or the right side of the appliance. The boilers are 
intended for usage in a closed system, and are additionally provided with a cooling coil pipe 
for the water block and a SYR 3065 or HONEYWELL TS131 thermal protection device.   
Another distinguishing feature of the Bio-max Plus boiler is the very low content of dusts and 
toxic  compounds  in  flue  gases  –  considerably  below  the  values  permitted  for  the  group  of 
solid–fuel fired boilers – which ensures that they are fully ecological.  
Every boiler in the standard configuration is a single–function heating appliance, however if it 
is connected to a hot domestic water heat exchanger (for example the LUMO WCW), it can 
also be used for the provision of hot domestic water. 
 
 
 

3.1.  Technical specification 

 
 

Figure No. 1. Section of the boiler with an indication of the direction of flow of flue 

gases 

 

 

Summary of Contents for BIO-MAX PLUS

Page 1: ...N MANUAL ul G wna 51 B Krosno 62 Heating boiler with automatic fuel delivery BIO MAX PLUS Series of types 70 300 kW TECHNICAL INSTRUCTION USER MANUAL AND INSTALLATION MANUAL LUMO Technika Grzewcza Sp...

Page 2: ...quality 14 4 7 Connection to the electrical system 14 4 8 Connection to the domestic hot water exchanger option 17 4 9 Connection of the boiler to a chimney stack system 18 5 OPERATION 19 5 1 Prepara...

Page 3: ...constant development and improvement of our products we would ask you to send us all and any comments concerning the functioning of our appliances and the level of service provided by our partners We...

Page 4: ...two weeks of the date of initial start up shall void the guarantee for your newly purchased appliance thus resulting in the user being required to cover the entirety of costs of all and any repair wor...

Page 5: ...hen there is a risk of water freezing in the system Water should also be drained in the event of a leak which may result in flooding ATTENTION It is forbidden to tamper with safety devices Only origin...

Page 6: ...e of their nature and scope may be carried out solely following disconnection of the power supply Further repairs may be carried out EXCLUSIVELY by the Authorised Service Centre or duly authorised per...

Page 7: ...t while in the upper part is a large and easily accessible washout hole which facilitates cleaning of the heat exchanger and the smoke tubes A tray for ash is located in the bottom part of the boiler...

Page 8: ...8 Figure No 2 Component elements of the boiler Figure No 2 Component elements of the boiler...

Page 9: ...9...

Page 10: ...10 3 2 Technical parameters Figure No 3 Boiler installation dimensions...

Page 11: ...factured in accordance with PN EN ISO 17225 2 2014 07 Voltage V Hz 230 50 Electrical terminal A 6 Power consumption in standby W 3 Power consumption under nominal operating conditions W 234 278 630 66...

Page 12: ...ther the phase conductor L is correctly located and whether the outlet has a ground terminal that is in good working order 4 2 Location of the boiler The boiler should be located in a separate room pu...

Page 13: ...775 4 3 Installation of the burner Installation of the burner consists solely in attaching it by means of screws to the boiler door The pertinent detailed technical information screw thread diameters...

Page 14: ...n Table No 1 These stub connectors and their corresponding joints are used to connect the boiler to the central heating system in the appropriate manner so as not to mix up supply with return for exam...

Page 15: ...required 4 6 Guidelines concerning water quality The quality of water used to fill the boiler and the system is of critical importance for their longevity and trouble free operation Inappropriate boil...

Page 16: ...16 Figure No 7 Wiring diagram ecoMAX860P Standard and ecoMAX860P Touch...

Page 17: ...eather based temperature sensor type CT6 P RS return water temperature sensor type CT4 FS feeding mechanism temperature sensor type CT4 OS optical flame brightness sensor BT boiler temperature sensor...

Page 18: ...RM2 room thermostat mixer 2 RM3 room thermostat mixer 3 L N PE power supply 230 V GR grounding strip PM2 PM3 pump mixer 2 3 SM2 SM3 servo motor mixer 2 3 CPU control A executory module of the ecoMAX8...

Page 19: ...ned by the duly authorised system designer The following figure presents an exemplary diagram of a system comprising a LUMO WCW hot domestic water exchanger and a Bio max Plus boiler Figure No 10 Exem...

Page 20: ...cts being released by the boiler into the boiler room and the concentration of CO in the combustion chamber While Bio max Plus boilers operate in their lower power range the temperature of flue gases...

Page 21: ...e boiler it is necessary to perform a fresh inspection of the appliance and its ancillary devices and in particular to carry out an internal inspection of the boiler water filling inspection to carry...

Page 22: ...manuals delivered together with these two devices During initial start up there may occur the phenomenon of boiler sweating In this event it will be necessary to intensify the combustion process in o...

Page 23: ...its ancillary devices at least once a year preferably before the start of the heating season The entirety of repairs inspections adjustments and maintenance may be performed solely by the Authorised S...

Page 24: ...ce a year every 12 months Inspection of the functioning of regulating and safety devices including the safety valve and the safety temperature limiter STB Inspection of the ventilation system Inspecti...

Page 25: ...urner in order to gain access to the combustion chamber and the smoke tubes Remove the flue gas turbulators coils from the smoke tubes Use a round steel brush seated on a cleaning rod to carefully cle...

Page 26: ...y of activities described under the present point are to be performed solely by the Authorised Service Centre 6 4 1 General guidelines During each inspection and maintenance operation performed on the...

Page 27: ...manufacturer must be followed at all times during such checks All and any failures caused by the incorrect functioning of the burner or brought about intentionally are displayed on the control panel...

Page 28: ...s and leads The controller has got damp Damaged display Check the electrical connection of the boiler Check the correctness of installation of plugs and whether the controller has been properly connec...

Page 29: ...29...

Reviews: