the responsibility of the user. LUMO Technika Grzewcza shall not be held liable for
any damage that may be caused by the addition of such agents.
The boiler, pumps and heating system must be properly deaerated.
The installation of a room regulator and/or a weather–based controller will make it
possible to increase the comfort of usage of the boiler and ensure a more efficient
utilisation of heat.
The boiler should be connected to a chimney stack that is resistant to flue
condensate (e.g. one fitted with the appropriate chimney liner), this following
consultations with the competent professional organisation and in accordance with
the currently valid regulations.
ATTENTION!
The boiler should be inspected, duly maintained and adjusted by the Authorised
Service Centre once a year (preferably before the heating season).
It is forbidden for the boiler to be operated by persons who are underage!
1.3.
Procedure to be followed in the event of a failure
IMMEDIATELY:
– Disconnect the boiler from the electrical system.
– Purge the boiler and the entire central heating system of water (if the failure occurs at a
time when there is a risk of water freezing in the system).
– Water should also be drained in the event of a leak which may result in flooding.
ATTENTION!
– It is forbidden to tamper with safety devices.
– Only original spare parts are to be used for repairs.
– It is forbidden to open the boiler doors or washout holes while the boiler is
operating.
– The fuel tank cannot be allowed to run until empty.
2.
TECHNICAL CONDITIONS FOR INSTALLATION OF THE
BOILER. REGULATIONS, PRINCIPLES AND GUIDELINES
2.1. Regulations concerning the room
.
Bio-max Plus boilers are to be installed in separate that are purpose–built as boiler
rooms, while their location must ensure freedom of access to the boiler from all sides. Proper
operation of the boiler and maintenance work cannot be obstructed or hindered by nearby
equipment, objects or the walls of the building. It is further necessary to ensure the efficient
delivery of fuel and provide access enabling the efficacious removal of ash.
The room in which the boiler is to be installed should have two gravity ventilation channels.
The intake channel should be placed at a height of approx. 15 cm above the floor, while the
exhaust channel should be located as high up as possible under the ceiling. This
arrangement ought to ensure the unhindered supply of fresh air from outside the building and
Summary of Contents for BIO-MAX PLUS
Page 8: ...8 Figure No 2 Component elements of the boiler Figure No 2 Component elements of the boiler...
Page 9: ...9...
Page 10: ...10 3 2 Technical parameters Figure No 3 Boiler installation dimensions...
Page 16: ...16 Figure No 7 Wiring diagram ecoMAX860P Standard and ecoMAX860P Touch...
Page 29: ...29...