When installing an open-air stockpile, a large open-air stockpile needs to be measured by multiple
meters. The meters can be fixed on the lifting frame, and the sensor probe should be aligned with the
surface of the medium.
4.3.1.3 Gantry frame installation
In the open container, a gantry frame installation can be used, and the takeover axis must be aligned
with the container outlet or perpendicular to the surface of the medium.
Integrated sensor--gantry frame installation
Open-air stockpile measurement-installation on a lifting frame
023
EN
7
0
1
7
8
7
2
.0
6
0
9
/2
0
1
8
C
H
/E
N
Ultrasonic Level Meter Menu Simple Setting Operation Instructions