Choose a Site
2-2
Communications Server Hardware Installation Guide
1. Choose a Site
Follow these guidelines to select a site for your PortMaster.
Environment
❏
Choose a clean and dust free environment.
❏
Choose a secure, flat surface area for desktop installation.
❏
Choose an air conditioned area if possible.
❏
Choose an area without direct sunlight, close proximity to heat sources, or high
levels of electromagnetic interference (EMI).
Chassis Accessibility
❏
Provide 3 inches (8cm) clearance at the rear of the PortMaster for cabling purposes.
Air Flow and Cooling
❏
Provide 3 inches (8cm) around all vent openings of the PortMaster for proper air
flow.
Power Guidelines
❏
Ensure that the power source of the PortMaster is properly grounded and falls
within the internal power supply rating. The PortMaster 2 series operates correctly
at any AC voltage from 100V to 260V and frequencies from 50Hz to 60Hz.
Summary of Contents for PortMaster PM-2
Page 4: ......
Page 8: ...Contents viii Communications Server Hardware Installation Guide...
Page 38: ...Set the Network Address 2 18 Communications Server Hardware Installation Guide...
Page 50: ...Removing PortMaster Expansion Boards 3 12 Communications Server Hardware Installation Guide...
Page 84: ...Ordering Instructions D 8 Communications Server Hardware Installation Guide...
Page 88: ...Index Index 4 Communications Server Hardware Installation Guide...