Lucent Technologies Lineage
®
2000 400A, 60Hz Ferroresonant Rectifier J85503C-3
6 - 12 Testing
Issue 10 July 2000
Local Equalize
Control Test
1. Set switch S2.1 on CM4 to on (right).
2. Move the FLT/EQ switch on the control panel (S2 on CM3) to the
equalize position. The equalize LED should light.
3. Disable the local equalize feature, if necessary, by setting the S2.1
switch on CM4 to off (left).
4. Return the FLT/EQ switch to the float position.
Low Current
Alarm (LCA) Test
Note: There is a built-in timer that cancels the Low Current Alarm for
5-7 minutes after a Rectifier Fail Alarm. Allow enough time between
RFA and LCA testing for this to occur.
1. If using the load share option, verify that the S1.9 switch on CM2
is in the 1 position (on).
2. Reduce the load to 0 amperes.
3. The LCA LED on the front panel should light and the LCA alarm
should issue to TB3, terminals 5 and 6.
Load Share Fail
(LSF) Test
Note: Load Share is disabled for 7 minutes following an RFA. Allow
enough time between RFA and LSF testing for this to occur.
1. Holding the insulation on a piece of wire, insert the wire in FS1 on
CM2.
2. The LSF LED on the control panel should light and the LSF alarm
should be generated on TB3-9 and TB3-10 of CM4.