Spare part list
Floor watering system
Copyright © 2018 Lubing System - All rights reserved
4
TABLE OF CONTENTS
1. INTRODUCTION
...............................................................................................................................
6
1.1 Short description LUBING Pad-climate-system
.................................................................................
6
1.2 Preface for the manual
....................................................................................................................
6
2. GENERAL INFORMATION
.................................................................................................................
6
2.1 Warnings and symbols
...................................................................................................................
6
2.2 Intended use
.................................................................................................................................
7
2.3 General safety directives - purpose
..................................................................................................
7
2.4 Obligations
...................................................................................................................................
7
2.5 Warranty and liability
......................................................................................................................
7
2.5 Electrical system
............................................................................................................................
8
3. ASSEMBLY
.......................................................................................................................................
8
3.1 Assembly information
.....................................................................................................................
8
3.2 Installation position in the building
....................................................................................................
8
3.3 Preparation of the attachment opening
.............................................................................................
8
3.4 Assembly instructions
....................................................................................................................
9
3.5 Recommended tools
......................................................................................................................
9
3.6 Installation procedure
.....................................................................................................................
9
3.6.1 Installation of the pipe, bottom, and baracket holders
................................................................
9
3.6.2 Assembly of the supply unit and holder for the water trough
.......................................................
9
3.6.3 Assembly of the pipe holders
................................................................................................
10
3.6.4 Glue connection
..................................................................................................................
11
3.6.4.1 Preparation of the parts
...........................................................................................
11
3.6.4.2 Pre-treatment of the adhesive surfaces
......................................................................
11
3.6.4.3 Processing
.............................................................................................................
11
3.6.4.4 Waiting times/pressure test
......................................................................................
11
3.6.4.5 Installation notes about Tangit
...................................................................................
12
3.6.4.6 Disposal
.................................................................................................................
12
3.6.4.7 Glue instructions
.....................................................................................................
12
3.6.5 Bonding of the water trough
.................................................................................................
13
3.6.6 Assembly of the pipe holders
................................................................................................
13
3.6.7 Assembly of the riser
...........................................................................................................
13
3.6.8 Assembly and alignment of the spraying pipe
.........................................................................
14
3.6.9 Installation of the guide rail
...................................................................................................
14
3.6.10 Coupling for deflector
.........................................................................................................
14
3.6.11 Covers of the water trough
..................................................................................................
16
3.6.12 End cover
.........................................................................................................................
17
3.6.13 End cover of deflector
.........................................................................................................
17
3.6.14 Insertion of the pads
..........................................................................................................
17
3.6.15 Splash protection..........
.....................................................................................................
18
3.6.16 Insertion of the pads......
.....................................................................................................
19
3.6.17 Opening of the guide rail
.....................................................................................................
19
3.7 Instructions for the bleed-off function
..............................................................................................
19
3.7.1 End cover with overflow
.......................................................................................................
20
4. OPERATING INSTRUCTIONS
..........................................................................................................
20
4.1 Concept of evaporation cooling
.....................................................................................................
20
4.2 Initial commissioning
....................................................................................................................
20
4.3 Operation of the system
................................................................................................................
21
4.4 Notices on national/international regulations........
.............................................................................
22
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com