Spare part list
Floor watering system
Copyright © 2018 Lubing System - All rights reserved
19
3.6.16 Insertion of the pads
The first pad is pushed into the lateral end cover. Then the following pads are inserted fl
ush against the previous
one. The second-to-last pad is pushed into the opposite end cover, so that the last pad can be inserted into the
still-open gap.
Once the pads are inserted, the front guide rails should be inserted. The coupling of the guide rail can be opened
and closed with the slider.
3.6.17 Opening of the guide rail
In order to open the guide rail, move the slider sideways. Then the guide rail can be disconnected.
3.7 Instructions for the bleed-off function
Use the bleed-off function to continually drain water. Continuous drainage of water improves the water quality on
demand.
Depending on the region and local water quality, continually drain 5-10
% of the entire water flow rate. This value should be increased at higher
mineral contamination.
For example: If the float valve conveys 20 liters/minute, about 1 liter/
minute should be drained additionally. An additional water dial may be
installed in the supply line for measurement through the float valve.
The desired setting should be determined during commissioning by
“calibration”: With the system running, set the 1/2” ball valve so that a
5-liter bucket can be filled in 5 minutes (cf. example above).
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com
lubingsystem.
com