0940-1_M+B-PutentraenkeGB
LUBING Floor Watering System
- 22 -
17. Clip the hanger onto the aluminium profile. The
hanger are positioned beside the metal coupler.
18. Secure the first suspension line to the Pressure Regulator. The suspension
cables are clamped approx. 10 cm above the hanger using the adjusting and
holding sheet metal.
1
2
4
5
Vorderseite
Front
Rückseite
Back
3
The LUBING adjusting and holding sheet metal is mounted as indicated in the above
diagram. The wire hanging from the ceiling is pulled approx. 50 cm through drill hole
1
. Then the rope has to be guided through drill hole
2
in the dropper clamp for the
aluminium profile. The end is pulled approx. 5 cm through drill hole
3
in the retaining
panel to secure. Then it is pulled through drill holes
4
and
5
and the end laid under
the wire between drill holes 3 and 4. Finish by pulling the wire taut.
Caution! The end of the wire must be cut off cleanly
without projecting over the retaining panel to prevent
injury!
To adjust the height, the lower end is turned 90° upwards. Simply let go after setting
the panel and this height adjustment is retained safely thanks to the rope guide.
19. Align the drinking line in such a way that the cups are on the ground (this
facilitates aligning the drinking line). Secure all of the other suspension wires the
same way. The traction rope is cut off approx. 10 cm before the last ceiling pulley
and connected with the last suspension line.