4.2.8 System work mode setup menu
Work Mode
•
Selling First: It means that the excess energy
has priority in grid connection.
•
Zero Export to Load: It means output power
according to it consumed by the load.
•
Zero Export to CT: It means output power
according to the CT position.
•
Solar Sell: It means that the excess solar energy
can be integrated into the grid.
•
Max Sell Power 0-5000W
Energy Pattern
•
Batt First--- It means solar power will charge
battery first, when battery is full then feed-out
power to the Load or Grid.
•
Load First-- The solar energy will be used to
supply the local load first, then to charge the
battery. The redundant power will export to the
public grid.
Time of use
①
Switch for Grid charging the battery.
②
Switch for Gen charging the battery.
③
There are six time period can be set, each
period must from small to large.
4.2.9 Grid setup menu
Please select the correct Grid Mode in your local
area. If you are not sure, please choose General
Standard.
Please select the correct Grid Type in your local
area, otherwise the machine will not work or be
damaged.