- Instruction Manual for ESS R050096 -
12
3.3 Installation Instructions
The battery system cabinet can be installed on the floor and wall mount. The system adopts
the natural heat dissipation method. When installing, 300mm of heat dissipation space is required
on the left and right sides of the cabinet.
Picture 3-1 Installation Diagram
3.3.1 Battery cabinet Installation Guide
(1)
Detach the mounting bracket: Use a screwdriver to unscrew the 4 fixing screws on the mounting
bracket and remove the bracket.
Picture 3-2 Disassembly and Assembly Bracket Diagram