PyroTec™ PRO Hardw are User’s Manual, V1.2
86
RT-MN024-1.2 02/21
Weekly
Maintenance
Instrument/Component
Maintenance Task
Reference
Liquid handling arm,
Robotic manipulator arm,
Clean front arm guide
See section “Arm Guide”
Air displacement
pipetting arm (Air LiHa)
Perform the following tests:
• Pressure Leak Test
See PyroTec™ PRO Software
User Guide
The weekly maintenance should be performed on the last working day of each week.
9.2.4 Maintenance Table: Yearly Maintenance
Annual maintenance will be performed by a Lonza approved FAS (field application specialist)
and be offered through a service contract. Reference material for the maintenance tasks
can be available upon request.
Every Twelve
Months
Instrument/Component
Maintenance Task
Air displacement pipetting
arm (Air LiHa)
Perform liquid handling
performance verification test
(Colorimetric QC Kit test or Gravimetric test)
Complete PyroTec™ PRO Clean system
Frontal arm guide
Clean
Worktable
Visually inspect worktable grids for wear and replace
if necessary.
LiHa
Visually inspect moving parts, especially Y-belt and lower DiTi eject
option, for wear and replace faulty parts.
Check parts for abrasion; wipe wear debris off, if necessary.
LiHa; support tubing
Check condition of mesh (must not be broken).
Check if support-tubing ends lock firmly in their seats.
Replace defective support tubing.
DiTi cone and tubing ex-
tension
Replace
Air LiHa; DiTi cone tip
adapter
Replace option DiTi cone Air LiHa
RoMa
Visually inspect moving parts, especially Y-belt, for wear and replace
faulty parts.
Check parts for abrasion; wipe wear debris off, if necessary.
RoMa; Z-rod
Clean
Complete PyroTec™ PRO Perform tests according to form “Preventive Maintenance”