OM-LKT-45G 9
Initial Start-Up
ImPORTANT
bE SURE All OPERATORS REAd, UNdERSTANd
ANd FOllOw ThE OPERATINg INSTRUCTIONS,
CAUTIONS, ANd SAFETY INSTRUCTIONS
CONTAINEd IN ThIS mANUAl.
AvOId All dIRECT CONTACT wITh hOT
SURFACES. dIRECT SKIN CONTACT COUld
RESUlT IN SEvERE bURNS.
AvOId All dIRECT CONTACT wITh hOT
FOOd OR wATER IN ThE KETTlE. dIRECT
CONTACT COUld RESUlT IN SEvERE bURNS.
Now that the kettle has been installed, it should be tested to ensure that it is operating
correctly.
1. Remove any literature and packing materials from inside of the unit.
2. Confirm that the tilting mechanism is operating properly by tilting the kettle
through its full range. Then return the kettle to the upright position.
3. Turn on the electrical service to the unit.
4. Pour 1-2 quarts of water into the kettle.
5. Following “To Start Kettle” instructions in the “Operation” section (Page 10),
begin heating the water at the highest thermostat setting. The HEATING indicator
light should come on, and heating should continue until the water boils.
If the unit functions as described, it is ready for use. If it does not function as
described, contact your LoLo Authorized Service Agency.