34
3.
Setup Modbus address
Configure modbus address(slave ID) for energy meters as per the
following table:
Device
Slave ID
(Generator 1)
Slave ID
(Generator 2)
Energy Meter
1
2
Flow Meter
3
4
Generator Controller
5
6
10. Installation Scenario
There are three scenarios where different setup is required for generator
monitoring.
10.1 Scenario 1 - 1 Generator & 1 Tank (Internal & External
Tanks)
Summary of Contents for EnergyLogicIQ
Page 1: ...2018 LogicLadder Instruction Manual EnergyLogicIQ Generator Monitoring System Version 12 2017...
Page 2: ......
Page 16: ...11...
Page 17: ...12 7 EnergyLogicIQ IoT Cloud Connector A Top View B Top Side View...
Page 18: ...13 C Left Side View D Bottom Side View...
Page 24: ...19 7 8 Connecting Generator On Off Signal and Run Hours...
Page 38: ...33 2 Setup communication parameter...
Page 40: ...35 10 2 Scenario 2 1 Generator 2 Tanks 10 3 Scenario 3 2 Generator 2 Tanks Internal Tanks...
Page 41: ...36 10 4 Scenario 4 2 Generator 3 Tanks 10 5 Scenario 5 2 Generator External Tanks...
Page 48: ...43 Baud Rate 115200 Bit 8 Stop Bit 1 Parity None...
Page 50: ...45 13 Declaration of Conformity...
Page 51: ...46...
Page 52: ...47...
Page 54: ......