SPACE 2000 (T and M versions) OPERATION MANUAL
9
Power supply connection
During this phase, the SPACE 2000 self-diagnostics program runs an internal
operating check and then prepares itself for the following operations to be
performed by the operator if the outcome is positive.
The system must:
• be connected to the power mains.
• have the inputs of the axes connected to the respective position transducers
(encoders or optical scales).
• have its digital parameters programmed adequately to the specifications of the
system in which it will be installed.
Consult the section of the manual entitled "MACHINE PARAMETER
PROGRAMMING” for further details.
Set the power supply switch on the
rear panel in ON position.
The SPACE 2000 PWR LED
begins flashing as the internal
operating check is run.
At the end of the check, the PWR
LED remains lit up steadily and all
the display conditions that were
valid before switching off are re-
proposed with flashing LED. The
flashing of the dimensions means
that these dimensions can be
considered valid, provided that:
• the axes have not been shifted
with the SPACE 2000 power
supply switched off;
• the internal memory has not been
set to zero (the ZERO POWER
RAM offers a minimum duration of
10 years).
All the INCH, ABS, and POS LEDs
are switched off.
Whenever anomalies are present,
the X-axis display will provide a
message that identifies the type of
anomaly
(see
TROUBLE-
SHOOTING)
If the buffer battery option is not
present
and
the
previously
memorised PIECE ZERO must be
restored, proceed as described for
the
PIECE ZERO RESTORATION
function.
Select the key:
The flashing
of the dimensions
comes to an end, the LEDs, the
functions and the origin enabled
resume the status they had prior to
the last time the readout was
switched off.
The SPACE 2000 is now ready for
operation.
E
nt