33/67
7.2.
Maintenance Braces
WARNING
Crushing hazard
Severe to fatal crushing injuries when working under the platform in the area of the lifting scissors.
Before entering the area under the platform, the maintenance supports must be set
Always insert both supports and engage them securely in the end position.
Sequence
1.
lower the masonry work platform completely.
2.
completely unload the platform.
3.
lift platform approx. 1.2m.
4.
leave platform via ladder, lift maintenance braces and fold out completely.
ATTENTION: The supports must always lock in the end position!
5.
climb onto the platform and lower platform to the stop.
6.
leave platform via ladder and carry out maintenance work.
Dismantling in reverse order.
Transport position
Maintenance
position
Summary of Contents for MAB 2001
Page 2: ...2 67 ...
Page 7: ...7 67 Notes ...
Page 18: ...18 67 20 14 24 8 2 1 20 19 18 7 17 20 25 5 1 26 6 6 4 7 1 2 21 5 9 10 11 12 13 14 15 16 22 ...
Page 45: ...45 67 ...
Page 48: ...48 67 1 ...
Page 50: ...50 67 2 ...
Page 53: ...53 67 3 ...
Page 54: ...54 67 4 ...
Page 55: ...55 67 5 ...
Page 56: ...56 67 HYDRAULIC DIAGRAM ...
Page 57: ...57 67 ...
Page 58: ...58 67 ...
Page 59: ...59 67 ...
Page 60: ...60 67 CIRCUIT DIAGRAM ...
Page 61: ...61 67 ...
Page 62: ...62 67 ...
Page 63: ...63 67 ...
Page 64: ...64 67 ...
Page 65: ...65 67 ...
Page 66: ...66 67 ...
Page 67: ...67 67 ...