background image

GSLG-A OPERATOR INSTALLATION GUIDE

- 13 -

IMPORTANT NOTES FOR

INSTALLATION OF MASTER/SLAVE APPLICATIONS

When setting up Master/Slave gate operators, it is best to make adjustments and run each operator individually. To do this, 
simply:

 

a.  Set Dip Switch #4 to proper hand of operation (right-hand or left-hand)

 

b.  Set Dip Switch #8 as Master (off)

Run each operator making current sensing adjustments as necessary, as indicated on the Control Board Adjustments page 
of this installation guide. When both operators have been adjusted, turn power off, then turn on Dip Switch #8 in the operator 
chosen as the Slave.

The timer to close and radio/single button behavior are set in the Master operator.

The following selections are set individually:
 Current 

Sensing

 Maximum 

Run 

Timer

 

One-Second Lock Release

 Three-Second 

Pre-Start 

Warning

 Right/Left-Hand 

Selections

SURGE PROTECTOR INSTRUCTIONS

The optional surge protector should be connected 
to any inputs that have an accessory connected to 
it. This includes the 3-button station, so it must be 
connected to 1, 2A and 3 in all cases. The green 
wire connected to ground, which is electrically 
the same as terminal 4. The red wires connect to 
terminals 2A and 24VDC+. This will cause the 
2 amp fuse to blow if this section of the module 
becomes shorted. With any of the other inputs 
connected to the surge protector, if their protection 
line becomes shorted due to a surge over the rating 
of the module, the corresponding LED on the main 
board will remain lit, causing a constant signal to 
the controller. If this is found, please replace the 
entire surge protector with a new unit.

Do not simply unhook the shorted wire, as this 
removes the protection from the circuit that was 
saved by the protector in the fi rst place!

Summary of Contents for GSLG-A

Page 1: ...L325 COMPLIANCE REQUIRES THE USE OF CONTACT EDGES OR PHOTOELECTRIC CONTROLS ON ALL AUTOMATIC OR REMOTELY CONTROLLED GATE OPERATORS USA Canada 800 421 1587 800 392 0123 760 438 7000 Toll Free FAX 800 4...

Page 2: ...tion 11 Onboard L E D Indicator Descriptions 12 Important Notes for Installation of Master Slave Applications 13 Surge Protector Instructions 13 Control and Accessory Connection Illustrations 14 17 IL...

Page 3: ...gate does not seem to operate properly it may affect the operator performance or greatly shorten the life of the unit The gate should be designed so that airflow through the fabric is ample to prevent...

Page 4: ...9 for details of this connection as well as dip switch selection Note The SHIELD wire should be connected in both the master and slave operators e s a h P 3 g n i r i W r e w o P s t l o V P H e c n...

Page 5: ...here are six 3 16 side plates which should be mounted on the outside top and bottom of the cabinet two 3 16 side plates which go on the top inside and two 1 2 side plates which should be mounted on th...

Page 6: ...idler over the drive sprocket and then under the last idler Make sure you feed most of the chain through the sprockets for attaching to the back end of the gate Assemble the other gate bracket on the...

Page 7: ...good working condition One person should be able to move the gate by hand Be certain the gate moves freely and without binding throughout its travel Torque limiters are set light at the factory and mu...

Page 8: ...operator after the limit switch is tripped Once the gate is in this position adjust the open limit nut until it activates the limit switch for open LSO 1 Press down on the detent plate and rotate the...

Page 9: ...of obstructions while running in the closed direction Master Slave Connection Block This terminal block is used in conjunction with two operators to configure two gates to open and close together Dip...

Page 10: ...ain prior to reaching a limit the gate will stop again and this time will sound the emergency alarm and lock out 4 51 CLOSE This function works exactly like the OPEN OBSTRUCTION except that it will on...

Page 11: ...otentiometer higher by 1 1 2 turns for all 115 Volt AC and 24 Volt DC operators and by 3 4 of a turn higher for all 230 Volt AC operators Additional fine adjustment by 1 4 turns may be necessary to el...

Page 12: ...tor wired to the safety loop terminals SHADOW LOOP This indicator is lit when a shadow hold open signal is present This signal is generated by a loop detector wired to the shadow loop terminals This i...

Page 13: ...nd Lock Release Three Second Pre Start Warning Right Left Hand Selections SURGE PROTECTOR INSTRUCTIONS The optional surge protector should be connected to any inputs that have an accessory connected t...

Page 14: ...GSLG A OPERATOR INSTALLATION GUIDE 14 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Page 15: ...GSLG A OPERATOR INSTALLATION GUIDE 15 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Page 16: ...GSLG A OPERATOR INSTALLATION GUIDE 16 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Page 17: ...GSLG A OPERATOR INSTALLATION GUIDE 17 CONTROL and ACCESSORY CONNECTION ILLUSTRATIONS...

Page 18: ...GSLG A OPERATOR INSTALLATION GUIDE 18 LOOP LAYOUT ILLUSTRATION Refer to Connection Descriptions on page 10 and Loop Accessory Connections on page 17 for details...

Page 19: ...GSLG A OPERATOR INSTALLATION GUIDE 19 EDGE LAYOUT ILLUSTRATION 1 Refer to Connection Descriptions on page 10 and Contact Edge Connections on page 16 for details...

Page 20: ...GSLG A OPERATOR INSTALLATION GUIDE 20 EDGE LAYOUT ILLUSTRATION 2 Refer to Connection Descriptions on page 10 and Contact Edge Connections on page 16 for details...

Page 21: ...GSLG A OPERATOR INSTALLATION GUIDE 21 PHOTO EYE ILLUSTRATION Refer to Connection Descriptions on page 10 and Photo Eye Connections on page 16 for details...

Page 22: ...GSLG A OPERATOR INSTALLATION GUIDE 22 PICKET GATE ILLUSTRATION Refer to Connection Descriptions on page 10 and Accessory Connections on pages 14 17 for additional details...

Page 23: ...GSLG A OPERATOR INSTALLATION GUIDE 23 TRACK GATE ILLUSTRATION...

Page 24: ...rent sensing set too low Make sure the gate moves freely through its entire travel before ad justing the current sensing B The maximum run timer may have counted down and expired This can be caused by...

Page 25: ...GSLG A OPERATOR INSTALLATION GUIDE 25 MODEL GSLG A MECHANICAL PARTS EXPLODED VIEW...

Page 26: ...s 2500 034 Power Switch only REF NO PART NO DESCRIPTION 46 2100 1756 Mounting Plate 47 2100 1781 Accessory Shelf for single phase models only 33 2400 308 Fender Washer 3 8 34 2400 017 Flat Washer 3 8...

Page 27: ...y 10 2510 249 Input Wire Harness Assembly 11 2510 250 Output Wire Harness Assembly 12 2510 261 Control Box Motor Harness Assembly 13 2500 071 Terminal Strip 16 141 14 2500 212 Transformer 115 24VAC 40...

Page 28: ...0 268 Control Board only 10 2500 1980 3 Phase Motor Board 11 2500 1966 2 Amp Fuse for Control Board 12 2500 1975 3 Amp Fuse for Control Board 13 2510 253 Limit Switch Harness REF NO PART NO DESCRIPTIO...

Page 29: ...ar the source Laboratory samples should be handled in a fume hood Provide mechanical ventilation of confined spaces HANDLING STORAGE AND SHIPPING Keep containers closed Handle and open containers with...

Page 30: ...lace as necessary Check for proper tension and adjust if required Check all pulley setscrews for tightness and tighten if necessary 3 For operators with internal chain drives inspect chain and sprocke...

Page 31: ...GSLG A OPERATOR INSTALLATION GUIDE 31 This page intentionally left blank...

Page 32: ...d that these signs must remain at all times 8 Controls intended for user activation are located at least six feet 6 away from any mov ing part of the gate and where the user is prevented from reaching...

Reviews: