
L i g h t S a n d
G F S - 2 H a r d w a r e G u i d e 3
-
23
P o w e r O n t h e F a b r i c
\Analysis\FabricLevel\Fabric
Figure 3-1
F
ABRIC
C
OMMAND
P
ATH
The command path for the switch status is:
\Analysis\SwitchLevel\Status
Figure 3-2
E
XAMPLE
OF
THE
P
ORT
S
TATUS
T
ABLE
3
Power on the edge switches
4
Power on the first edge switch to merge the edge switch and the core switches into
one fabric. Wait for the fabric to complete initialization before proceeding to the
next step.
5
Power on the remaining edge switches.
This completes the procedure for powering on the switches.
Summary of Contents for GFS-2
Page 1: ...Installation and User Manual for the GFS 2 August 2003...
Page 2: ......
Page 4: ......
Page 13: ...L i g h t S a n d G F S 2 H a r d w a r e G u i d e x...
Page 15: ...x i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Page 17: ...x i i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Page 53: ...C 36 L i g h t S a n d G F S 2 H a r d w a r e G u i d e T r o u b l e s h o o t i n g...
Page 56: ......