Power on the devices:
4
Power on or connect the storage devices.
5
Power on or connect the host devices.
5
Verify the SAN.
Power Off the Switches and Devices
1
Make sure all switches are powered off.
2
Power off all devices that can be powered off, to minimize PLOGIs.
3
Disconnect the ports of any devices that cannot be powered off.
Power On the Fabric
This section contains the generic procedure for powering on the switches in a
High Port Count Fabric. The actual order of powering on switches may vary
depending on your SAN topology.
Power on the Core Switches
NOTE:
Make sure devices are powered off or disconnected before proceeding.
1
Power on the core switches. All of the core switches can be powered on
simultaneously. If the core switches are not cascaded, then each switch comes up as
a separate fabric.
2
Check the fabric and switch status on each switch using the available commands on
the switch. The status command path for the GFS-2 is:
Summary of Contents for GFS-2
Page 1: ...Installation and User Manual for the GFS 2 August 2003...
Page 2: ......
Page 4: ......
Page 13: ...L i g h t S a n d G F S 2 H a r d w a r e G u i d e x...
Page 15: ...x i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Page 17: ...x i i i L i g h t S a n d G F S 2 H a r d w a r e G u i d e...
Page 53: ...C 36 L i g h t S a n d G F S 2 H a r d w a r e G u i d e T r o u b l e s h o o t i n g...
Page 56: ......