2.24 MANUAL PUMP
Verify the maximum pressure of the manual pump:
ii. close the inlet valve and open the pressure gauge valve;
iii. activate the manual pump;
iv. the gauge will indicate the maximum pressure reached:
this value must be maximum 2,3 x maximum static pressure
described in the paragraph
2.4
of this manual;
v. discharge the pressure opening the inlet valve;
vi. refresh
2.25 OVERPRESSURE VALVE TEST
Check the calibration of the overpressure valve:
i.
bring the car to the lowest floor;
ii. close the inlet valve and open the pressure gauge valve;
iii. call the car to the upper floor, using the upward command;
iv. the gauge will indicate the maximum pressure reached:
this value must be maximum 1,4 maximum static pressure
described in the paragraph
2.4
of this manual;
v.
refresh.
2.26 PULLEY SAFETY COVERS
Check the presence and the correct assembly of the
safety covers applied on the pulleys
.
2.27 GUIDE BRACKETS CENTER TO CENTER DISTANCE
Make sure that the vertical distance between the guide fixing brackets
does not exceed the distance indicated in the project
drawing
.
2.28 GROUNDING CONNECTION
Check the electrical continuity:
i.
with the lift moving, generate a short circuit between the last point of the safety chain and the grounding;
ii. verify the car stop and
the automatic valve activation (alternatively a fuse burning)
;
iii. refresh.
2.29 ELECTRICAL COMPONENTS INSULATION
Check the insulation related to the grounding
(the minimum value must be 0,5 MΩ)
following the electrical drawings.
2.30 SHAFT LIGHTING AND SOCKET (if any)
i.
with the help of the switch, check the switching on and off of the shaft lighting (if present);
ii. check the power in the socket (230 V).