18
ENGLISH
6. PRODUCT INSTALLATION
6-1. Precautions for installation
1) When considering the place for the Centrifugal chiller, secure enough space to allow the installation of the at-
tached device, wiring, piping and maintenance access. Check the level and strength of the base for installation.
Refer to the product specification, product dimension, and foundation drawing for the parts to lift the Centrifugal
Chiller, product weight, and operating weight.
2) Service clearance for a Centrifugal chiller differs by model. Secure enough space to provide services to the
Chiller. Refer to the Section 3.3
3) When installing multiple Centrifugal chillers at the same site, secure the appropriate service space.
4) The following base dimensions are based on the standard model. Prepare foundation fitting the model to install
after checking the foundation drawing approved.
Table 5. The basic dimensions (standard)
Figure 8. Basic measurement (standard model)
(Unit : mm)
!
WARNING
• Make sure to install the Centrifugal Chiller in a place with enough strength to support the product weight.
Insufficient strength may cause the Centrifugal Chiller to drop and also damage of the product and human life.
• Install the product in a way to protect it from an earthquake.
A defect in installation may cause the Centrifugal Chiller to drop and cause injury.
Be cautious about the support strength of a floor surface, drainage treatment (drain trench construction, treat-
ment of water from the Centrifugal Chiller while operating), piping and wiring especially when making the
foundation plane.
Capacity
A
B
C
D
100RT
2,510
710
400
150~200
200RT
3,400
1,300
400
150~200
300RT
4,100
1,300
400
150~200
Summary of Contents for RCWFL Series
Page 40: ...40 ENGLISH 3 Control panel wiring diagram ...
Page 41: ...41 ENGLISH 3 Control panel wiring diagram ...
Page 42: ......