Installation
12
Ventilator
n
Installation of Unit
Install the unit above the ceiling correctly.
• Apply a Flexible duct between the unit and duct to absorb unnecessary vibration.
• Install the unit leaning to a drainage hole side as a figure for easy water drainage.
• A place where the unit will be leveled and that can support the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
1. Avoid installing air conditioner in such circumstances where cutting oil mist or iron pow-
der is in suspension in factories, etc.
2. Avoid places where inflammable gas is generated, flows in, is stored or vented.
3. Avoid places where sulfurous acid gas or corrosive gas is generated.
4. Avoid places near high frequency generators.
CASE 1
CASE 2
Ceiling dimension and hanging bolt location
Return Air(RA)
Supply Air(SA)
Exhaust Air(EA)
Outdoor Air(OA)
Inspection hatches
600
600
600
600
1006
599
1204
1140
Hanger bracket
Washer
Nut
Double nut
POSITION OF SUSPENSION BOLT
POSITION OF CONSOLE BOLT
Summary of Contents for LZ-H050GXH0
Page 33: ......