5.2.3.3
Requirements on the brake cables
ƒ
Use a Lenze system cable with integrated brake cable.
–
The shielding of the brake cable must be separated.
ƒ
Length: max. 50 m
ƒ
If a separately installed brake cable is required, lay it in a shielded manner.
Note!
Due to the monitoring circuit of the brake connection, an additional
constant voltage drop of 1.5 V is produced. The voltage drop can be
compensated by a higher voltage at the cable entry.
The voltage required at X6/B+ and X6/B− for the Lenze system cables is
calculated as follows:
U
K
[V]
+
U
B
[V]
)
0.08
ƪ
V
m
@
A
ƫ
@
L
L
[m]
@
I
B
[A]
)
1.5[V]
V
co
mp
Voltage required at 6X/B+ and X6/B− [V]
V
B
Rated operating voltage of the brake [V]
L
L
Length of the brake cable [m]
I
B
Brake current [A]
B+
B-
X6
BD2
BD1
X25
+
+23 ... +30 V DC
max. 1.5 A
F 1.6 A
_
+
_
1.5
A
M
3~
+
"
"
ECSXA017
Fig. 5−4
Connection of the motor holding brake to X25
HF−shield termination by large−surface connection to functional earth (see
Mounting Instructions for ECSZS000X0B shield mounting kit)