24
G7028 Installation Guide
SFP+ LEDs
Status LEDs for the SFP+ ports are described in the following table.
RJ-45 Ports
There are twenty-four 10/100/1000BASE-T Gigabit Ethernet (GbE) RJ-45 ports on
the front of the G7028.
To attach an RJ-45 connector to the switch, push the RJ-45 cable connector into the
port connector until it clicks into place.
Note:
Shielded twisted-pair cables are recommended for use with the RJ-45
management port.
RJ-45 LEDs
The RJ-45 port LEDs are oriented as shown
Figure 5
.
Figure 6. RJ-45 port status LEDs
Status LEDs for the RJ-45 ports are described in the following table.
Table 4. SFP+ port status LED behavior
LED
State
Functional Meaning
Link/Activity
Steady green
Link up
Off
No link
Flashing green
Activity
Table 5. RJ-45 port status LED behavior
LED
State
Functional Meaning
Link/Activity
Steady green
Link up
Off
No link
Flashing green
Activity
Speed
Steady green
100/1000 Mbps
Off
10 Mbps or no link
Link/Activity LED
Speed LED
Summary of Contents for RackSwitch G7028
Page 1: ...Lenovo RackSwitch G7028 Installation Guide ...
Page 6: ...6 G7028 Installation Guide ...
Page 14: ...14 G7028 Installation Guide ...
Page 18: ...18 G7028 Installation Guide ...
Page 28: ...28 G7028 Installation Guide ...
Page 54: ...54 G7028 Installation Guide ...
Page 68: ...68 G7028 Installation Guide ...
Page 74: ...74 G7028 Installation Guide ...
Page 76: ...76 G7028 Installation Guide ...