36
G7028 Installation Guide
To install the G7028 in a standard equipment rack, complete the following steps:
1. Locate, record, and retain the product switch information in order to configure
and register your product. See
“Recording Important Product Information” on
page 30
.
Note:
If this switch is a replacement switch, copy the product information from the
original switch onto the RID label that is shipped with replacement switch
and affix the new label to the bottom of the new switch.
2. Attach a mounting bracket (Item 1) to each side of the switch with M4 screws
(Item 2). Torque the screws to approximately 2.0 newton-meters (Nm) ± 0.1 Nm
(17.7 inch-pounds).
3. From the front, slide the switch into the rack at the desired height.
4. Secure the switch unit to the rack posts with M6 screws (Item 3), washers
(Item 6), and either clip nuts (Item 4) or cage nuts (Item 5). Torque the screws
to approximately 5.7 Nm ± 0.1 Nm (50 inch-pounds).
5. If installing the 1U air-duct option, see the instruction on
page 47
.
6. Connect all external cables in accordance with the
“Cabling Guidelines” on
page 34
.
2
1
6
3
4
Summary of Contents for RackSwitch G7028
Page 1: ...Lenovo RackSwitch G7028 Installation Guide ...
Page 6: ...6 G7028 Installation Guide ...
Page 14: ...14 G7028 Installation Guide ...
Page 18: ...18 G7028 Installation Guide ...
Page 28: ...28 G7028 Installation Guide ...
Page 54: ...54 G7028 Installation Guide ...
Page 68: ...68 G7028 Installation Guide ...
Page 74: ...74 G7028 Installation Guide ...
Page 76: ...76 G7028 Installation Guide ...