Installing the Air-Duct Option
The G7028 supports an optional 1U air duct to maximize air flow conditions in a 19”
rack.
For information on removing an installed 1U air-duct option, see
“Removing the
Air-Duct Option” on page 65
.
The following table lists the parts included with the air-duct option kit.
Attention:
The rack-mounting frame may not be able to support the weight of the
networking switch with only the front post mounting brackets (2-post application). If
the switch has an undesirable amount of sag, it is recommended to use a 4-post
mounting kit.
Attention:
For earthquake stability, mount the switch in a 4-post rack.
Table 10. Air-duct Option Kit parts
Item Number
Description
Quantity
1
Cable tie
4
2
1U Duct sleeve (long)
1
3
Mounting bracket (left)
1
4
Mounting bracket (right)
1
5
Foam carrier assembly
2
6
M3.5 screws
6
1
6
5
Summary of Contents for RackSwitch G7028
Page 1: ...Lenovo RackSwitch G7028 Installation Guide ...
Page 6: ...6 G7028 Installation Guide ...
Page 14: ...14 G7028 Installation Guide ...
Page 18: ...18 G7028 Installation Guide ...
Page 28: ...28 G7028 Installation Guide ...
Page 54: ...54 G7028 Installation Guide ...
Page 68: ...68 G7028 Installation Guide ...
Page 74: ...74 G7028 Installation Guide ...
Page 76: ...76 G7028 Installation Guide ...