GUIDE SPECIFICATIONS
TS − 3 to 5 Ton R−410A Air Conditioners
PART 1.05
QUALITY ASSURANCE
A.
Qualifications:
1.
Installer experienced in performing work of this section who has specialized in installation of work similar to that
required for this project.
2.
Manufacturer Qualifications: Manufacturer capable of providing field service representation during construction and
approving application method.
B.
Preinstallation Meetings: Conduct Pre−installation meeting to verify project requirements, manufacturer’s installation
instructions and manufacturer’s warranty requirements. Comply with Division 01 Project Management and Coordination
(Project Meetings).
PART 1.06
DELIVERY, STORAGE & HANDLING
A.
General: Comply with
[01 61 00 − Common Product Requirements] [_____]
.
B.
Ordering: Comply with manufacturer’s ordering instructions and lead time requirements to avoid construction delays.
C.
Packing, Shipping, Handling and Delivery:
1.
Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.
2.
Ship, handle and unload units according to manufacturer’s instructions.
D.
Storage and Protection:
1.
Store materials protected from exposure to harmful weather conditions.
2.
Factory shipping covers to remain in place until installation.
Specifier Note: Include or remove following section as project dictates
.
E.
Waste Management and Disposal:
Specifier Note: ENVIRONMENT: The disposal of packaging waste into landfill site demonstrates an inefficient use of natural
resources and consumes valuable landfill space
.
1.
Separate waste materials for
[Reuse] [And] [Recycling] [_____] in accordance with Section [01 74 19 −
Construction Waste Management and Disposal] [_____]
.
2.
Remove from site and dispose of packaging materials at appropriate recycling facilities.
3.
Collect and separate for
disposal [Paper] [Plastic] [Polystyrene] [Corrugated cardboard] [_____] packaging
material [In appropriate onsite bins] [_____] for recycling
.
Specifier Note: Coordinate article below with Conditions of the Contract and with Division 01 Closeout Submittals
(Warranty)
.
PART 1.07
WARRANTY
A.
Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
B.
Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard warranty document executed by
authorized company official. Manufacturer’s warranty is in addition to, and not a limitation of, other rights Owner may have
under Contract Documents.
Specifier Note: Coordinate paragraph below with manufacturer’s warranty requirements
.
C.
Warranty: Commencing on Date of Installation.
1.
Compressor: Five years (limited) (non−residential applications)
2.
Other Covered Components: One year (limited) (non−residential applications)