Page 47
508117-01 2/2021
Configuration ID 2
1 2 3 4 5 6 7 8 9 10
Not Installed =
N
Installed on M4 =
C
Installed on DDC
Controller =
D
Dirty Filter Switch (S27) [2]
Not Installed =
N
Installed on M4 =
C
Installed on DDC Controller =
D
Not Installed =
N
Installed = Y
N
= Not Installed
Y
=
Installed
[8] Load Shedding
N
= Not Installed
G
=
Global (P297 - pin 9)
2
= Installed on DI-2
3
= Installed on DI-3
[9] Electric Heat
(Field-Installed)
[1]
Air Flow Proving
Switch (S52)
[3]
Overflow Switch
(S149 / S179)
[4]
Reserved
Reserved for future use =
N
[7] Zone Bypass
Damper
N
= Not Installed
Y
=
Installed
[6] IAQ Options
N = Not Installed
1 = UV Lamp Installed
2 = Bipolar Ionizer Installed
3 = UV Lamp and
Bipolar Ionizer Installed
FIGURE 49
[10] Reserved
N
= Not Installed
Phase / Voltage Detection * [5]
N
= Not Installed
1
=
Enabled Internal (Lennox)
2
= External (A42) Phase Detection
on DI-2
3
= External (A42) Phase Detection
on DI-3
* When phase detection and voltage monitoring is enabled and wired incorrectly,
the system will go into demand hold status and restart after six minutes.