STEP 3 -- LEAK TEST AND EVACUATION (Continued)

A - 

Open both manifold valves and start the vacuum pump.

B - 

Evacuate the line set and indoor unit to an 

absolute pressure

 of 23,000 microns (29.01 inches of mercury).

NOTE 

- During the early stages of evacuation, it is desirable to close the manifold gauge valve at least once. A rapid rise in pressure

indicates a relatively large leak. If this occurs, 

repeat the leak testing procedure

.

NOTE 

- The term 

absolute pressure

 means the total actual pressure above absolute zero within a given volume or system. Absolute

pressure in a vacuum is equal to atmospheric pressure minus vacuum pressure.

C - 

When the absolute pressure reaches 23,000 microns (29.01 inches of
mercury), perform the following:

S

Close manifold gauge valves.

S

Close valve on vacuum pump.

S

Turn off vacuum pump.

S

Disconnect manifold gauge center port hose from vacuum pump.

S

Attach manifold center port hose to a nitrogen cylinder with pressure
regulator set to 150 psig (1034 kPa) and purge the hose.

S

Open manifold gauge valves to break the vacuum in the line set and indoor
unit.

S

Close manifold gauge valves.

D - 

Shut off the nitrogen cylinder and remove the manifold gauge hose from the cylinder. Open the manifold gauge valves to release the
nitrogen from the line set and indoor unit.

E - 

Reconnect the manifold gauge to the vacuum pump, turn the pump on, and continue to evacuate the line set and indoor unit until the
absolute pressure does not rise above 500 microns (29.9 inches of mercury) within a 20-minute period after shutting off the vacuum pump
and closing the manifold gauge valves.

F - 

When the absolute pressure requirement above has been met, disconnect the manifold hose from the vacuum pump and connect it to a
cylinder of HFC-410A positioned to deliver liquid refrigerant. Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the
line set and indoor unit.

G - 

Perform the following:

S

Close manifold gauge valves.

S

Shut off HFC-410A cylinder.

S

Reinstall service valve cores by removing manifold hose from service valve. Quickly install cores with core
tool while maintaining a positive system pressure.

S

Replace stem caps and finger tighten them, then tighten an additional one-sixth (1/6) of a turn as illustrated.

OUTDOOR

UNIT

TO VAPOR

SERVICE VALVE

TO LIQUID LINE
SERVICE VALVE

MICRON

GAUGE

VACUUM PUMP

1/4 SAE TEE WITH SWIVEL
COUPLER

500

MANIFOLD

GAUGE SET

HFC-410A

RECOMMEND

MINIMUM 3/8” HOSE

A - 

Connect low side of manifold gauge set with
1/4 SAE in-line tee to 

vapor 

line service valve

B - 

Connect high side of manifold gauge set to

liquid 

line service valve

C - 

Connect available micron gauge connector
on the 1/4 SAE in-line tee.

D - 

Connect the vacuum pump (with vacuum
gauge) to the center port of the manifold
gauge set. The center port line will be used
later for both the HFC-410A and nitrogen
containers.

HIGH

LOW

1

2

3

4

5

6

7

8

9

10

11 12

1/6 TURN

NITROGEN

3

CONNECT GAUGE SET

A

B

C

D

4

EVACUATE THE SYSTEM

NOTE 

- Remove cores from service valves (if not already done).

Possible equipment damage.

Avoid deep vacuum operation. Do not use
compressors to evacuate a system.
Extremely low vacuum can cause internal
arcing and compressor failure. Damage
caused by deep vacuum operation will
void warranty.

WARNING !

NOTE -

 Position can­

ister to deliver liquid
refrigerant.

EVACUATION

FIGURE 11

Summary of Contents for Elite XP14-018-230

Page 1: ...stment alteration service or maintenance can cause property damage personal in jury or loss of life Installation and service must be performed by a li censed professional installer or equivalent or se...

Page 2: ...Unit Placement NOTICE Roof Damage This system contains both refrigerant and oil Some rubber roofing material may absorb oil causing the rubber to degrade Failure to follow this notice could result in...

Page 3: ...or expansion valve approved for use with HFC 410A refrigerant must be ordered separately and installed prior to operating the system LEG DETAIL BASE 2 50 8MM SCH 40 FEMALE THREADED ADAPTER ELEVATED SL...

Page 4: ...ated NOTE Some applications may require a field provided 7 8 to 1 1 8 adapter NOTE When installing refrigerant lines longer than 50 feet refer to the Refrigerant Piping Design and Fabrica tion Guideli...

Page 5: ...eflon rings H Use a field provided fitting to temporarily reconnect the liquid line to the indoor unit s liquid line orifice housing LOW HIGH EXISTING INDOOR UNIT GAUGE MANIFOLD CYLINDER CONTAINING CL...

Page 6: ...r the ends The pipe must remain round Do not crimp end of the line Remove service cap and core from both the vapor and liquid line service ports 1 2 LIQUID LINE SERVICE VALVE SERVICE PORT CORE SERVICE...

Page 7: ...oths WHEN BRAZING LINE SET TO SERVICE VALVES POINT FLAME AWAY FROM SERVICE VALVE PREPARATION FOR NEXT STEP 7 WRAP SERVICE VALVES To help protect service valve seals during brazing wrap water saturated...

Page 8: ...mounted external to the coil casing sensing bulb installation for bulb positioning STUB END TEFLON RING LIQUID LINE ASSEMBLY WITH BRASS NUT DISTRIBUTOR ASSEMBLY 3 Install one of the provided Teflon r...

Page 9: ...e to 150 psig 1034 kPa Open the valve on the high side of the manifold gauge set in order to pressurize the line set and the indoor unit E After a few minutes open one of the service valve ports and v...

Page 10: ...pump and closing the manifold gauge valves F When the absolute pressure requirement above has been met disconnect the manifold hose from the vacuum pump and connect it to a cylinder of HFC 410A positi...

Page 11: ...ith this product CAUTION Failure to use properly sized wiring and circuit breaker may result in property damage Size wiring and circuit breaker s per Product Specifications bulletin EHB and unit ratin...

Page 12: ...AND HIGH VOLTAGE CIRCUITS A B C D 3 FIGURE 13 Typical 24VAC Control Wiring Diagrams Field Installed THERMOSTAT INDOOR UNIT R C W1 Y1 O G R C W1 W2 W3 G R C W1 Y1 O COMMON 1ST STAGE AUXILIARY HEAT IND...

Page 13: ...rvice port which has a factory installed valve stem Figures 15 and 16 provide information on how to access and operate both angle and ball type service valves Torque Requirements When servicing or rep...

Page 14: ...clockwise ACCESS SERVICE PORT FIGURE 17 Checking Refrigerant Charge The XP14 unit is factory charged with enough HFC 410A refrigerant to accommodate a 15 foot length of refrigerant piping Charge shoul...

Page 15: ...ed the unit will remain in forced defrost mode until defrost thermostat opens or termin ated on maximum defrost time 14 minutes If the jumper is not removed once 5 seconds has elapsed 7 seconds total...

Page 16: ...the snow level below the louvered panels NOTE The filter and all access panels must be in place any time the unit is in operation If you are unsure about the filter required for your system call your...

Page 17: ...con firm that pipes are not rubbing copper to copper Also ensure that refrigerant pipes are not being af fected by indoor air contamination Check condition of insulation on the refrigerant lines Repai...

Page 18: ...e Supply Air Temperature Ambient Temperature Return Air Temperature System Refrigerant Charge Refer to manufacturer s information on unit or installation instructions for required subcooling and appro...

Reviews: