
Handover protocol 4
(Copy for the Importer)
Complete this document when the machine is delivered and keep it.
Date of delivery:
........................................................................
Machine
type:
RPC 445 Tornado
........................................................................
Machine no. on the data plate (e. g. 4895.00.001):
........................................................................
I purchased / use this machine. The operating manual including the EC conformity declaration (page next to the last in the operating
manual) was delivered to me together with the machine. I was clearly instructed in the safety, operating, and maintenance instructions of the
machine.
Some components of the machine may have been removed for transportation.
Do not use the machine unless these components have been correctly installed again!
The following components must be reinstalled prior to first commissioning:
See separate document "Container Removal and Assembly Instructions".
Remove installed steel shipping wheels. Install the enclosed pneumatic tired wheels.
Remove the installed shipping rod (see picture).
.....................................
...........................................................................
Date
Customers
Signature
Summary of Contents for RPC 445 TORNADO
Page 2: ......
Page 125: ...MAINTENANCE BALER LELY WELGER y RPC 445 Tornado 117 Figure 101...
Page 131: ...MAINTENANCE BALER LELY WELGER y RPC 445 Tornado 123 10 23 2 Control electronics SG 2 A B...
Page 132: ...MAINTENANCE BALER 124 LELY WELGER y RPC 445 Tornado 10 23 3 Control electronics SG 3 A B...
Page 144: ......