Page 7 Operating Manual EM CPD300 12/18
3.
Installation and Warranty
3.1
Installation
Required space for setting up the unit: width 340 mm, depth 583 mm.
Operating room temperature:
20 – 35C° at 1bar (CO
2
bottle limit)
Relative humidity:
5 – 90%
To allow adequate intake of cooling air required for the refrigeration unit and due to
the inflexibility of the high-pressure gas hose, a free space of 150 mm has to be
provided on the backside of the instrument.
Connection of CO
2
Container
It is absolutely
necessary
to use a pressurized gas container with a pipe (feed pipe),
so that the medium (CO
2
) can reach the specimen pressure chamber in liquid form. It
is important here to ensure that the CO
2
-Container is not equipped with a residual
pressure valve.
In order to prevent accidents, the
CO
2
-pressurized gas container must be
securely fastened in an upright position.
Screw the high-pressure gas hose onto the CO
2
IN connection.
Summary of Contents for EM CPD300
Page 1: ...From Eye to Insight OPERATING MANUAL EM CPD300 167180032 Version 12 18 ...
Page 30: ...Page 27 Operating Manual EM CPD300 12 18 Press Start to activate program Test ...
Page 48: ...Page 45 Operating Manual EM CPD300 12 18 After software update press back ...
Page 52: ...Page 49 Operating Manual EM CPD300 12 18 Remove poral filter with spring from the nut ...