Keor MOD
Installa
tion and main
tenanc
e manual
73
During the hot-swap procedure the maximum active power available is indicated in the following table:
MAXIMUM ACTIVE POWER AVAILABLE
KEOR MOD 50
25 kW (50%)
KEOR MOD 75
50 kW (66%)
KEOR MOD 100
75 kW (75%)
KEOR MOD 125
100 kW (80%)
KEOR MOD 150
125 kW (84%)
KEOR MOD 175
150 kW (86%)
KEOR MOD 200
175 kW (88,5%)
KEOR MOD 225
200 kW (89%)
KEOR MOD 250
225 kW (90%)
The following is the how-swap procedure:
1. Check that the load connected to the UPS allows the power module replacement without causing an overload.
2. On the main screen, tap on the UPS which has the PM to replace.
Summary of Contents for Keor MOD 100
Page 1: ...Part LE11406AB 04 19 01 GF Keor MOD Installation and maintenance manual ...
Page 2: ...2 EN ENGLISH 3 Keor MOD ...
Page 20: ...20 4 Installation 3 4 5 ...
Page 22: ...22 4 Installation 9 10 ...
Page 24: ...24 4 Installation KEOR MOD 250 earthing bars ...
Page 79: ...Keor MOD Installation and maintenance manual 79 6 3 3 Removal of the SSS drawer 1 2 3 4 ...
Page 87: ...Keor MOD Installation and maintenance manual 87 ...
Page 88: ...88 9 Mechanical characteristics ...
Page 89: ...Keor MOD Installation and maintenance manual 89 ...
Page 90: ...90 9 Mechanical characteristics ...
Page 92: ...92 9 Mechanical characteristics 9 3 Battery drawer all the dimensions are in mm ...